May 2003

Power supply installation

11Select a #10 green wire safety ground and attach it to the cabinet.

12Measure the module ground continuity by touching one multimeter lead to any BATRTN terminal block connector and the other end to the GND terminal block connector.

The measurement should be between 0–0.5 ohms.

Part 2: 1001rp Server Hardware Installation

51

Page 51
Image 51
Nortel Networks 555-7101-217, P0605618 manual May