Preparing for installation

Standard 1.0

Installation overview

Introduction

This section provides an overview of the steps required to install the 1001rp server and peripheral devices.

Installation checklist

The following checklist identifies the tasks that must be performed when installing the CallPilot server. For detailed instructions, see Chapter 4, “Installing the server and connecting the peripheral devices.”

When you are finished, continue with Part 3 of the CallPilot Installation and Configuration binder.

Step

Description

Check

 

 

 

1

Ensure that you have reviewed the “Installing CallPilot” section

 

in Part 1 of the CallPilot Installation and Configuration binder,

 

 

and completed stage 1 of the “Installation checklist.”

 

 

 

 

2

Unpack the server, and ensure you have all the items you need

 

(see page 29).

 

 

Complete the following checklists that are provided in Part 1 of

 

 

the CallPilot Installation and Configuration binder:

 

 

Ñ“CallPilot software media and documentation checklist”

 

 

“CallPilot server hardware checklist”

 

 

 

 

3

Remove the front bezel and server cover, and inspect the

 

interior (see pages 31 and 35).

 

 

 

 

4

Replace the server cover.

 

 

 

5

Install the power supply modules in the server (see page 40).