North Star 864 HH installation manual Table of Contents

Models: 864 HH

1 68
Download 68 pages 62.14 Kb
Page 3
Image 3

Table of Contents

3

Introduction

 

Overview

2

Listing Details

2

Safety Precautions

 

Safety Precautions

4

Features and Specifications

 

Features

6

Installation Options

6

Heating Specifications

6

Dimensions

6

Installation

 

Packing List

7

Additional Items Required

7

Installation Overview

7

Recommended Installation Procedure

7

Massachusetts Requirements

8

Converting the Fireplace to Top Vent Configuration

9

Fireplace Placement Requirements

11

Clearances

11

Raised Fireplaces

11

Min. Framing Dims. - Rear Vent Configuration

12

Min. Framing Dims. - Top Vent Configuration

13

Nailing Brackets

14

Corner Installations - Rear Vent Configuration

15

Corner Installations - Top Vent Configuration

16

Gas Line Requirements

17

Fuel

17

Gas Line Connection

17

Gas Inlet Pressure

17

Gas Line Location

17

Electrical Connection (required)

19

Wall Switch or Thermostat Installation

20

Wiring Diagram (Millivolt System)

20

Wall Switch Installation

20

Vent Requirements

21

Vent Clearances

21

Altitude Considerations

21

Approved Vent

22

Vent Installation

22

Approved Vent Configurations

23

Restrictor Position

23

Exhaust Restrictor Adjustment

23

Intake Restrictor Adjustment

24

Diffuser Plate Adjustment

25

Rear Vent Config. W Horizontal Term. (no vertical rise) . 26

Rear Vent Config. W Horizontal Term. (w vertical rise) ...

27

Rear Vent Configuration with Vertical Termination

28

Top Vent Configuration with Horizontal Termination

29

Top Vent Configuration with Vertical Termination

30

Termination Requirements

31

Installation (continued)

 

Hearth Requirements

32

Facing Requirements

33

Drywall Installation

33

Facing Overview

34

Optional Faceplates – Sizing Chart

34

Thin Facing Installation

35

Thick Facing Installation

37

Thick Facing Installation with FPX Arched Faces

38

Mantel Requirements

40

Install Example - Build-Out (Dog-House) w Hor. Term....

41

Install Example - Build-In w Hor. Term

42

Finalizing the Installation

 

Steps for Finalizing the Installation

43

Starting the Pilot Flame

43

Pilot Flame Inspection

43

Air Shutter Adjustment

44

Glass Frame Removal and Installation

45

Fireback and Grate Installation

47

Log Set Installation

48

LP Conversion Instructions

52

Optional Equipment

 

Grill Installation

55

Remote Control Receiver Installation (2 Options)

56

Extra Room Power Heat Duct

57

Accent Light Installation (sku 94400100)

64

Index

 

Index

68

© Travis Industries

4070201

100-01182_002

Page 3
Image 3
North Star 864 HH installation manual Table of Contents