Installation (for qualified installers only)

7

 

 

Packing List

 

 

 

 

Propane Conversion Kit

Wall Switch with Wire (see page 20 for details)

 

 

 

Log Set (9 piece)

Firestop (sku 93006094)

 

 

Grate

Additional Items Required

FIREBACKS ARE REQUIRED – See page 47. (sku 98500662, 98500663, 98500664, or 98500665)

Direct Vent

Gas Line Equipment (shutoff valve, pipe, etc.)

Electrical Equipment (min. 14 gauge, grounded line)

Grill

Installation Overview

All requirements below must be met.

Top Vent

Configuration

See the section "Mantel Requirements"

 

Drywall

Side

1" Min.

Wall

 

See "Facing

Requirements"

See "Optional Non-

 

 

Combustible Hearth"

 

See the section

 

"Electrical Connection"

See the section "Vent Requirements"

See the section "Approved Vent Configurations"

Insulation must not fill the 1/2" clearance around the back and sides of the fireplace.

Nailing Brackets

See the section "Minimum

Framing Dimensions"

See the section

"Gas Line Installation"

Rear Vent

 

Configuration

 

Required

Travis

Firestop (sku

93006094)

 

Recommended Installation Procedure

Frame the opening for the fireplace. Make sure to allow for vent installation.

This fireplace is designed to accommodate 1/2" or 5/8" drywall (see "Nailing Brackets" on page 14 for details). Secure the fireplace to the framing.

Install the vent, gas line and electrical hook-up.

Install the wall switch (see page 20) or thermostat (if applicable).

Install the drywall.

Install the hearth (if applicable).

Install the facing (if applicable).

Install the mantel (if applicable).

Finalize the installation (see page 43) and install the grill or face.