Inspecting and Unpacking Each Cabinet

The first task in preparing for installation is inspecting and unpacking each cabinet. Cabinets arrive covered with protective packaging material, as shown in Figure 4.

OUTER

PACKAGING

PLY---FOAM CUSHIONS

Figure 4. Cabinet as Shipped, with Outer Packaging and Pallet

6

Powerware 9350 Series 685 and 1085 Auxiliary Battery Cabinets

 

 

Installation Manual 164201408 Rev. P00 053002