TOP VIEW

FRONT VIEW

Ground Wire

Ground Stud

Bracket from kit Bracket from kit

Nut from kit

Screw from kit

Nut from kit

Front of 685

Front of UPS

Battery Cabinet

Figure 9. Attaching UPS Base to Series 685 Base

17.Locate the ground wire from the field kit. Route the ground wire from the customer ground stud in the battery cabinet, under the lower right-hand battery tray, through the access hole in the side panel of the UPS, and attach to customer ground stud in the UPS cabinet. Hardware is provided on each ground stud.

18.Repeat Steps 2 through 17 to attach additional Series 685 Battery Cabinets to the other side of the first battery cabinet. Level the cabinets with the leveling screws.

 

 

 

Powerware 9350 Series 685 and 1085 Auxiliary Battery Cabinets

15

Installation Manual 164201408 Rev. P00 053002

 

 

Page 21
Image 21
Powerware 1085 installation manual Attaching UPS Base to Series 685 Base