Powerware 1085 installation manual Connecting Two Series 685 Bases

Models: 685 1085

1 54
Download 54 pages 22.86 Kb
Page 28
Image 28

Grounding cable

Ground

Studs

Existing hinge

Bracket from kit

Bracket from kit

 

Nut from kit

Nut from kit

Screw from kit

Front of

Front of

Battery Cabinet #1

Battery Cabinet #2

Figure 15. Connecting Two Series 685 Bases

3.Locate the cabinet connecting bracket and two M4×10 hex head screws from the field kit. Attach the bracket to the lower right-hand side of battery cabinet #2 using the two screws (see Figure 15).

4.Locate the large flat bracket from the field kit. Place the bracket over the stud on the bottom side of battery cabinet #1 lower hinge, and over the stud on the bottom side of the cabinet connecting bracket on battery cabinet #2. Attach the bracket with two M8 self-locking nuts from the field kit (see Figure 15).

5.Locate the ground wire from the field kit. Route the ground wire from the customer ground stud in battery cabinet #1, under the lower right-hand battery tray, into the cable access area in battery cabinet #2, and attach to customer ground stud. Hardware is provided on each ground stud.

6.Repeat Steps 1 through 5 to join additional Series 685 Battery Cabinets together.

22

Powerware 9350 Series 685 and 1085 Auxiliary Battery Cabinets

 

Installation Manual 164201408 Rev. P00 053002

Page 28
Image 28
Powerware 1085 installation manual Connecting Two Series 685 Bases