Completing the Installation Checklist
The final step in installing your battery cabinet is to complete the Installation Checklist. This checklist ensures that you have installed all hardware, cables, and other equipment. Completing all items on the checklist will ensure a smooth installation. Make a copy of the Installation Checklist before filling it out, and retain the original.
After completing your installation, a service representative will be able to verify the operation of your battery cabinet, and commission it to support your critical load. The service representative cannot perform any installation tasks other than verifying that the battery cabinet has been correctly installed. Service personnel may request a copy of the completed Installation Checklist to be sure you have completed all applicable equipment installation requirements.
NOTE:
The Installation Checklist MUST be completed prior to starting up the UPS system for the first time.
Installation Checklist for Powerware 9350 30 through 160
(It is recommended that the battery cabinet be installed on a sealed concrete pad or a sealed concrete floor.)
|
|
|
Powerware 9350 Series 685 and 1085 Auxiliary Battery Cabinets | 27 | |
Installation Manual 164201408 Rev. P00 053002 |
|
|