Installation Checklist for Powerware 9350---160

-All packing materials and restraints have been removed from each cabinet.

-Each cabinet in the battery system is placed in its correct location.

-All battery cabinets are bolted together.

-A ground wire is installed between all cabinets that are bolted together.

-All conduits and cables are properly routed to the battery cabinets.

-A ground conductor is properly installed.

-Battery cables and harness are terminated on the battery terminals E4 and E5 in the UPS cabinet.

-Internal battery cabinet connections have been completed (bus bars, plugs, etc.)

-Air conditioning equipment is installed and operating correctly.

-The area around the installed battery system is clean and dust-free.

(It is recommended that the battery cabinet be installed on a sealed concrete pad or a sealed concrete floor.)

-Adequate working area exists around the battery cabinet and other cabinets.

-Adequate lighting is provided around all battery cabinet equipment.

-A remote battery disconnect control is mounted in its installed location and its wiring is terminated inside the battery cabinet (OPTIONAL).

 

 

 

 

32

Powerware 9350 Series 685 and 1085 Auxiliary Battery Cabinets

 

 

Installation Manual 164201408 Rev. P00 053002

Page 38
Image 38
Powerware 685, 1085 installation manual Installation Checklist for Powerware