Powerware 685, 1085 installation manual Installation Manual 164201408 Rev. P00

Models: 685 1085

1 54
Download 54 pages 22.86 Kb
Page 32
Image 32

8.Mount the side panels to the sides of the first and last battery cabinets:

a.Mount the hanger brackets to the top side of the battery cabinets using M4 screws (see Figure 11).

b.Hang the side panel on the hanger brackets and align it with the front and rear of the battery cabinet.

c.Secure the side panel at the bottom using M4 hex head screws.

9.Secure all battery cabinets by closing and latching the doors.

10.Secure the UPS by reinstalling safety shields and closing and latching the doors.

26

Powerware 9350 Series 685 and 1085 Auxiliary Battery Cabinets

 

Installation Manual 164201408 Rev. P00 053002

Page 32
Image 32
Powerware 685, 1085 installation manual Installation Manual 164201408 Rev. P00