Chapter 2 Installation and Set Up 2.1 Unpacking and Inspection
Before assembling the system, use the shipping bill as a reference to ensure that all parts have
arrived. Pressure Systems takes no responsibility for equipment that is damaged during
shipment. If containers are broken, ripped, or damaged, contact the transportation carrier. If
the equipment itself appears to be damaged, contact the Repair Department at Pressure
Systems at 1-800-678-SCAN (7226).
Each shipment will contain one or more of the following components:
98RK-1 Scanner Interface Rack chassis
9816 Intelligent Pressure Scanner modules (installed in the 98RK-1, if ordered)
Start-up software (NUSS) on CD-ROM
9882 Pneumatic Blanking Unit (if purchased)
98RK-1 Scanner Interface Rack User’s Manual on CD-ROM.
2.2 Safety Considerations
It is always a good idea to wear safety glasses when operating this equipment or when working
with pressurized lines. Always ensure that high pressure lines are properly secured and that all
pneumatic lines are rated for the proper pressure and temperature environments.
Ensure that the rack Power Switch is turned OFF before plugging the Scanner Interface Rack
into a power receptacle. Always check line voltages and ensure the correct voltage for your
Scanner Interface Rack prior to plugging into the receptacle.