Pressure Systems, Inc. 98RK-1 & 9816 User’s Manual©
Page 123 www.PressureSystems.com
(5) Ensure that the three (3) solenoid manifold O-rings are present and free of
contaminants. Replace the solenoid with the new one by carefully aligning and gently
tightening the screws.
(6) Attach the wiring harness to the solenoid and connector P5 of the PC-299 board.
(7) Reassemble the module.
(8) Test your scanner to ensure proper operation.
5.1.6 Replacement of O-Rings
Scanner calibration valves include both static and dynamic O-ring seals. When used properly,
the rated durability of the dynamic O-rings is in excess of 1,000,000 shifts of the calibration
valve.
The procedures described below should be used for replacement of all the O-rings in the Model
9816 Intelligent Pressure Scanner. Use the tools and follow the general warnings already
described at the start of Section 5.1.1.
The material needed for the O-ring replacement can be acquired through the proper
maintenance kit available from Pressure Systems. Specifically needed for these procedures are
proper size O-rings, Teflon cup seals, a fast evaporating cleaning fluid ( e.g., acetone, alcohol,
Freon, etc.), 50 PSI dry air supply, a glue syringe and glue (for those O-rings needing glue),and
Krytox® fluorinated grease (read product warnings and recommendations thoroughly).
Service of O-ring seals requires a clean working environment. Introduction of contaminants
to the O-ring or internal calibration manifold surfaces can result in internal pneumatic leaks.
Inspection for contaminates generally requires some type of magnification device, such as a
microscope.