Connect Copy Job Flow

Connect Copy Job Flow

The job flow depends on the status of the two machines.

When One of the Two

Machines is Idle

One of the machines is copying Original A.

B Machine <2> begins copying Original B. Machine <1> also starts copying Original B when it has finished with Original A.

4

AFU040S

 

1.

Sub-machine

 

2.

Main machine

ADB050S

Using the idle machine as the main machine (Connect Copy)

A Make Connect Copy settings for Original B on machine <2> (the idle machine).

Using the machine currently copying as the main machine (Connect Copy: Job Preset)

A Make Connect Copy settings for Original B on machine <1> (the machine currently in use).

AFU042S

AFU041S

111