OfficeServ 7100 Installation Manual

CHAPTER 2. Installing Cabinets

This chapter describes how to install an OfficeServ 7100 cabinet on the ground, inside rack or on a wall depending on the installation environment.

2.1 Procedure for the System Installation

The procedure of system installation is as follows:

1)Install the cabinet on the ground, inside rack or on a wall depending on the installation environment.

2)Ground to the ground lug behind the basic cabinet.

3)Insert the MP10/11 board into the slot 0 of the basic cabinet.

4)Insert various interface boards into the universal slots(slot 1 and slot 2).

5)Connect an external battery.

6)Connect input power of AC 230 V..

2.2Selecting Installation Method

The OfficeServ 7100 cabinet can be installed on the ground, inside a 19-inch rack or on a wall depending on the number of cabinets and environment of the installation area.

© SAMSUNG Electronics Co., Ltd.

2-1

Page 25
Image 25
Samsung 7100 installation manual Installing Cabinets, Procedure for the System Installation, Selecting Installation Method