CAUTION
•Install the indoor unit away from any interfering sources such as radio, computer, stereo equipment and also select the place where the electrical wiring work can be possible.
•Make sure to install the outdoor unit in a safe place where snowfall will not be obstructed. The frame should be installed in a place where the air inlet and heat exchanger of the unit are not buried in the snow.
•A ventilation system may be required in the case the outdoor unit is installed in a closed space or room, even though R410a is not poisonous or flammable.
•Install the railing around the outdoor unit to prevent falling when the unit is installed at high place of roof on the building.
•Avoid installing the units in places such as an exhaust pipe and ventilating opening exposed to corrosive gas, oxides of sulfur, ammonia gas or sulfur gas herbicides. (These places need additional anticorrosive treatments. Please contact manufacture to avoid corroding copper pipes or soldered parts)
•Depending on the condition of power supply, unstable power or voltage may cause malfunction of the parts or control system. (At the ship or places using power supply from electric generator...etc)
Space requirements
•The space suggested below is based on operating condition of outdoor temperature of 35°C. If operating condition of outdoor temperature is higher than 35°C, try to have more space.
•Make sure to clear a passage for a person and air flow.
•Observe the clearances and dimensions as seen below when installing the outdoor unit.
•If you install several outdoor units at the same place, observe the space for ventilation and free airflow.
•If the space for ventilation is insufficient, the air conditioner may not generate performance designed. Keep in mind that SAMSUNG logo is located on the front side of outdoor unit.
INSTALLATION PARTS
English 37