P R E P A R A T I O N | For Machines Mfg. Since 3/11 |
Power Supply
Requirements
Availability
Before installing the machine, consider the availability and proximity of the required power supply circuit. If an existing circuit does not meet the requirements for this machine, a new circuit must be installed.
To minimize the risk of electrocution, fire, or equipment damage, installation work and electrical wiring must be done by an electrician or qualified service personnel in accordance with all applicable codes.
Serious injury could occur if you connect the machine to power before completing the setup process. DO NOT connect to power until instructed later in this manual.
Full-Load Current Rating
The
SB1046PF | 19.23 Amps |
SB1047PF | 19.23 Amps |
SB1048PF | 19.23 Amps |
SB1056F | 19.23 Amps |
SB1057F | 19.23 Amps |
SB1058F | 19.23 Amps |
For your own safety and protection of property, consult an electrician if you are unsure about wiring practices or applicable electrical codes.
The
If the machine is overloaded for a sufficient length of time, damage, overheating, or fire may
Circuit Requirements
This machine is prewired to operate on a 440V power supply circuit that has a verified ground and meets the following requirements:
Nominal Voltage | 440V/480V |
Cycle | 60 Hz |
Phase | |
Circuit Rating | 30 Amps |
Connection... Hardwire with Locking Switch
A power supply circuit includes all electrical equipment between the main breaker box or fuse panel in your building and the incoming power connections inside the machine. This circuit must be safely sized to handle the
Note: The circuit requirements in this manual are for a dedicated