5.Remove the dosing hopper from the dosing unit.

6.Dismantle the dosing unit and remove the scraper (D).

7.Loosen the two hexagon socket screws (B, M6 x 30) on the top side of the dosing disc

(A).

8.Loosen the center hexagon socket screw (C, M6 x 12) and replace by an M6 x 60 screw.

9.Lift the dosing disc (A) from the dosing unit housing (B) by this screw.

10.Clean the scraper using a cotton cloth.

11.Clean the dosing hopper and the dosing disc in soapy water.

12.The dosing unit housing may also be cleaned with soapy water.

13.Ensure that soapy water does not enter ball bearings.

14.Dry all parts thoroughly.

Installing the Dosing Station

1.Place the dosing disc in the dosing unit housing.

2.Remove the screw (M6 x 60).

3.Screw the dosing disc in place by means of 2 hexagon socket screws (M6 x 30).

4.Mount the center hexagon screw (M6 x 12).

5.Install the scraper and then the dosing unit.

6.Turn the dosing disc to check for smooth movement.

7.Position the dosing hopper on the dosing unit.

8.Tighten the profile clamp.

Digital Dosing Units

37

Page 38
Image 38
Sterling BF3-600 specifications Installing the Dosing Station