Taylor manual Step, Models C709 & C717, Operating Procedures

Models: C717 C709

1 69
Download 69 pages 16.18 Kb
Page 39
Image 39

Step 3

Insert the baffle rods through the beaters in the freezing cylinders. With the door seated on the freezer studs, install the handscrews, with the longer ones on top. Tighten equally in a criss-cross pattern to insure the door is snug.

Figure 26

Step 4

Slide the three o-rings into the grooves of each standard draw valve. Slide the H-ring and o-ring into the grooves of the center draw valve. Lubricate the H-ring and o-rings.

Figure 27

Step 5

Lubricate the inside of the freezer door spouts, top and bottom.

Figure 28

Step 6

Insert the draw valves from the bottom until the slot in each draw valve comes into view.

Figure 29

Step 7

Position each draw handle with the adjustment screw facing down. Slide the fork of each draw handle into the slot of each draw valve, starting from the right.

Models C709 & C717

35

Operating Procedures

 

 

 

Page 39
Image 39
Taylor manual Step, Models C709 & C717, Operating Procedures