Installing 4310-30/50-KP-B

The 4310-30/50-KP-B Kick Plate Kit contains one pair of F/B kick plates. This kit is required for each standard ad- ditional 4300 Series add on frame, such as the 431A and 431B. The 431M is already provided with a base skirt.

NOTE: Due to variations within manufacturing specifications, the spacing on the base channels may be slightly greater of less than the separation between the magnetic latches of the kick plates.

To correct this the installer should bend the magnetic latch support tab slightly to ensure a snug fit to the base channels.

STEP 1: Move Side Plates to outer-most

C-channel base

Move the Side kick plates to the the outer sides of the assembled 4300 Series units. See Figure 13-7, 13-8.

STEP 2: Install the F/B Plates

Install the F/B kick plates as described on Pages 50-52.

Figure 15-7

Batt. Cabinet

4300 UPS

MBS Cabinet

Aux. Cabinet

Side Kick

Plate

Side Kick

Plate F/B Kick Plates

(Back Side Similar)

Figure 15-8

66

4300 Series Ancillary Cabinets Installation and Operation Manual

Page 74
Image 74
Toshiba 431A Installing 4310-30/50-KP-B, Move Side Plates to outer-most Channel base, Install the F/B Plates