P5 |
|
|
| suitable mounting |
Preparing the Opening |
| surface 2” x 6” | ||
|
| header board | lumber minimum | |
|
|
| ||
| WARNING | Failure to | 2” x 6” lumber |
|
Tools Needed: | recommended |
| ||
securely attach a |
| |||
|
|
| ||
Recommended | suitable mounting pad to structurally |
| door height | |
tools from | sound framing could cause springs to |
| ||
|
| |||
page 5 | violently pull mounting pad from wall, | level header |
| |
| resulting in severe or fatal injury. | plumb jambs |
| |
|
|
|
| |
| If you just removed your existing door or you are installing a new door, |
|
| |
| complete all steps in PREPARING THE OPENING. |
|
| |
| To ensure secure mounting of track brackets, side and center bearing | door |
| |
| brackets, or steel angles to new or |
| ||
| width |
| ||
| to follow the procedures outlined in DASMA Technical Data Sheets #156, |
| ||
|
|
| ||
| #161 and #164 at www.dasma.com. |
|
|
|
| The inside perimeter of your garage door opening should be framed with |
|
| |
| wood jamb and header material. The jambs and header must be securely |
|
| |
| fastened to sound framing members. It is recommended that 2” x 6” lumber |
|
| |
| be used. The jambs must be plumb and the header level. The jambs should |
|
| |
| extend a minimum of 14” (356 mm) above the top of the opening for Torsion |
|
| |
| spring applications. For low headroom applications, the jambs should extend | headroom |
| |
| to the ceiling height. Minimum side clearance required, from the opening to | header |
| |
| the wall, is |
| backroom | |
|
|
| ||
| IMPORTANT: Closely inspect existing jambs, header and mounting surface. |
|
| |
| Any wood found not to be sound, must be replaced. |
|
| |
| For Torsion spring applications, a suitable mounting surface must be firmly |
| jamb | |
|
|
| ||
| attached to the wall, above the header at the center of the opening. The |
|
| |
| mounting surface must be 2” x 6” lumber minimum (Select southern yellow |
|
| |
| pine lumber. Do not use lumber marked as |
|
| |
| mounting surface must be securely attached to the wall with four (4) 3/8” | WEATHER SEAL |
| |
| anchors for masonry constructions or four (4) 5/16” x 4” lag screws for wood |
| ||
| construction. |
|
|
|
| NOTE: Drill a 3/16” pilot hole in the mounting surface to avoid splitting the | jamb |
| |
| lumber. Do not attach the mounting surface with nails. |
|
Weather Seal (May Not Be Included):
Cut or trim the weather seal (if necessary) to the header and jambs.
For quick install track: Align the header seal with the inside edge of the |
|
|
|
| weather | |
header and temporarily secure it to the header with equally spaced nails. |
|
|
|
| seal | |
Next, fit the jamb seals up tight against the header seal and flush with the |
|
|
|
|
| |
inside edge of the jamb. Temporarily secure the jamb seals with equally |
|
|
|
|
| |
spaced nails. This will keep the bottom section from falling out of the opening |
|
|
|
|
| |
during installation. Space nails approximately 12” apart. |
|
| jamb 1/8” to 1/4” | |||
|
|
| ||||
For fully adjustable track: Align the header seal 1/8” to 1/4” inside the | headroom requirement |
| ||||
header and temporarily secure it to the header with equally spaced nails. |
| |||||
Next, fit the jamb seals up tight against the header seal and 1/8” to 1/4” |
|
|
|
|
| |
inside the jamb. Temporarily secure the jamb seals with equally spaced | TRACK TYPE | TorqueMaster® |
| |||
nails. This will keep the bottom section from falling out of the opening during | 15” Radius Track |
|
| |||
installation. Space nails approximately 12” apart. |
|
| ||||
NOTE: Do not permanently attach weather seal to the jamb at this time. | 12” Radius Track |
|
| |||
6” LHR Kit |
| 6” |
| |||
|
|
| ||||
HEADROOM REQUIREMENT: Headroom is defined as the space needed |
|
|
|
|
| |
above the top of the door for tracks, springs, etc. to allow the door to open | backroom requirement |
| ||||
properly. If the door is to be motor operated, |
|
|
|
|
| |
headroom is required. | DOOR HEIGHT | TRACK |
| MANUAL | MOTOR | |
|
| LIFT | OPERATED | |||
NOTE: 6” LHR Conversion Kit is available for 12” Radius only. Contact your |
|
|
| |||
6’5”, 6’6”, 7’0” | 12”, 15” Radius | 98” | 120” | |||
local | ||||||
BACKROOM REQUIREMENT: Backroom is defined as the distance needed | 7’6”, 8’0” | 12”, 15” Radius | 110” | 132” | ||
from the opening back into the garage to allow the door to open fully. |
|
|
|
|
|
10
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at