5 | Vertical Track | fLAGANGLE | |
5/16” x 2” | |||
| |||
|
| LAG SCREWS | |
Tools Needed: | IMPORTANT: The tops of the |
| |
3/16” Drill Bit | vertical tracks must be level |
| |
from side to side. If the bottom |
| ||
|
| ||
Power Drill | section was shimmed to level it. |
| |
The vertical track on the shimmed |
| ||
|
| ||
7/16” Socket | side, must be raised the height of |
| |
the shim. |
| ||
Driver |
| ||
|
| ||
Tape Measure | Position the left hand vertical track |
| |
| assembly over the rollers of the bottom | VERTICAL | |
Level | section. Make sure the counterbalance | ||
TRACK | |||
(2) Vice Grips | cable is located between the rollers and | ASSEMBLY | |
the door jamb. | JAMB | ||
|
| ||
| Drill 3/16” pilot holes for the lag screws. | BRACKET | |
|
| ||
| Loosely fasten jamb brackets and |
| |
| flagangle to the jamb using 5/16” x 2” |
| |
| lag screws. |
|
On the bottom jamb bracket, tighten the lag screw securing the bottom jamb bracket to the jamb, to maintain the 5/8” spacing.
BOTTOM
Repeat for the right hand side. | SECTION |
vertical track
BOTTOM SECTION
5/8”
roller
jamb bracket
LAG
SCREW
locations
lag
screw
14
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at