Wayne-Dalton 9100, 9400, 9600 installation instructions Top Section, Installation

Models: 9600 9100 9400

1 36
Download 36 pages 11.38 Kb
Page 19
Image 19
Top Section

11

Top Section

 

 

 

Tools Needed:

Place the top section in the opening

door width

 

and vertically align with lower sections.

Hammer

+3-3/8” to 3-1/2”

 

Tape Measure

Temporarily secure the top section by

 

driving a nail in the header near the

 

 

 

Power Drill

center of the door and bending it over

 

 

the top section.

 

7/16” Socket

 

 

Driver

Now flip up hinge leaf against section,

 

 

fastening center hinges first, and end

 

 

hinges last. (Refer to Step 6).

 

When installing a door with a torsion counterbalance system, vertical track alignment is critical. Position flagangle between 1-11/16” (43 mm) to 1-3/4” (44 mm) from the edge of the door. Tighten the bottom lag screw. Flagangles must be parallel to the door sections.

Repeat for opposite side.

IMPORTANT: THE DIMENSION

 

 

 

BETWEEN THE FLAGANGLES MUST BE

 

 

 

DOOR WIDTH PLUS 3-3/8” (86MM) TO

 

 

 

3-1/2” (89 MM) FOR SMOOTH, SAFE

NAIL

 

vERTICAL tRACK

DOOR OPERATION.

 

 

 

 

 

Complete the vertical track installation

 

 

 

by securing the center jamb bracket(s)

 

 

ROLLER

and tightening the other lag screws.

 

 

 

Push the vertical track against the

 

 

 

rollers so that the rollers are touching

 

 

 

the deepest part of the curved side of

 

 

 

the track (see illustration). Tighten all

 

top section

ROLLER Against

the carriage bolts and nuts.

 

 

 

 

VERTICAL TRACK

 

 

 

Repeat for opposite side.

 

 

 

 

 

 

1-11/16” TO 1-3/4”

FLAGANGLE

top

SECTION

19

INSTALLATION

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

Page 19
Image 19
Wayne-Dalton 9100, 9400, 9600 installation instructions Top Section, Installation