Water chiller systems

Pipe the boiler and water chiller as shown in Figure 16.

Install boiler, as shown, so chilled medium is piped in parallel with heating boiler. Use appropriate valves to prevent chilled medium from entering boiler. See Figure 16 for typical installation of balancing valve and check valve.

Install the flow/check valve in the boiler supply piping, as shown in Figure 16, to prevent gravity circulation during the cooling cycle.

If boiler is connected to heating coils located in air handling units where they can be exposed to refrigerated air, use flow control valves or other automatic means to prevent gravity circulation during cooling cycle.

Figure 16 Installing GV boiler in system with water chiller

 

 

Expansion tank

12"

 

 

 

max

 

Balancing

Fill

 

 

valve

 

 

Pump

 

 

 

System

 

 

supply

 

shutoff

 

 

valve

 

Flow/check

 

 

valve

 

 

 

Water

 

shutoff

chiller

 

valves

 

 

 

Strainer

 

 

Boiler

 

 

Check

 

 

valve

 

 

shutoff

System

 

valve

 

 

return

85012

 

 

36

Part number 550-141-850/0699

Page 36
Image 36
Weil-McLain GOLD DV WATER BOILER, 550-141-850/0599 manual IIIj Water piping water chiller systems, Water chiller systems