Installation • Start-Up • Parts • Maintenance

Xb Service and maintenance — schedule

Table 4 Service and maintenance schedules

Service technician

(see following pages for instructions)

 

Inspect:

 

• Any problems reported by owner

 

Boiler area

 

Air openings

 

Flue gas vent

 

Boiler heating surfaces

 

Water piping

-UP

• Condensate drain system

Service:

START

Lubricate blower motor

 

 

Lubricate any circulators requiring oil

ANNNUAL

Start-up:

Check cold fill & operating pressures

 

Perform start-up per manual

 

Check/test:

 

Check gas piping for leaks

 

• Check temperature mixing system

 

• Check/maintain components - vents,

 

 

limits, expansion tank, gauges, igniter

 

Inspect & operate relief valve

Review:

Review maintenance procedures with owner

Owner maintenance

(see following pages for instructions)

 

Check boiler area

Daily

• Check air openings

 

• Check pressure gauge

 

 

 

 

Check boiler interior piping

 

• Check venting system

Monthly

Check air vents

 

• Check condensate drain system

 

Check relief valve

 

 

 

 

Test low water cutoff (if used)

Periodically

Clean vent termination/air intake

 

 

 

screens

 

 

 

Every 6 months

Oil blower motor

Operate relief valve

 

 

 

End of season

• Shut down procedure

 

 

 

Part number 550-141-850/0699

57

Page 57
Image 57
Weil-McLain 550-141-850/0599, GOLD DV WATER BOILER manual Xb Service and maintenance schedule, Service technician