Manuals
/
Weil-McLain
/
Household Appliance
/
Boiler
Weil-McLain
550-141-850/0599, GOLD DV WATER BOILER
manual
85048
Models:
GOLD DV WATER BOILER
550-141-850/0599
1
91
96
96
Download
96 pages
38.64 Kb
88
89
90
91
92
93
94
95
<
>
Troubleshooting
Install
IXb Operation wiring diagrams
VI Field wiring
Dimension
Outdoor reset control
To remove the blower assembly
Check-out procedure checklist
Connect and adjust manometer
How to
Page 91
Image 91
• Installation •
Start-Up
• Parts • Maintenance
Figure 38
Trim assembly
SY
STEM
85048
Part number
550-141-850/0699
91
Page 90
Page 92
Page 91
Image 91
Page 90
Page 92
Contents
Gold GV
How it works
Gold GV Water boiler Series
Please read before proceeding
Hazard definitions Installer User
Boiler operation
When servicing boiler
Boiler water
Contents
Contents
Overview of this section
Ia Prepare boiler location overview
Ib Prepare boiler location codes & altitude
Installations must follow these codes
Small space
Ic Prepare boiler location clearances
Clearance options
Large space
Flooring
Residential garage installation
Precautions
Flooring and foundation
Removing from existing vent
Id Prepare boiler location vent system
GV special vent system
Air contamination
Ie Prepare boiler location contamination
If Prepare boiler location air openings
GV in small space less than alone
Special considerations
IIb Prepare boiler vent starter tee & drain
IIa Prepare boiler overview
Screw hole Base rail Insert Cpvc elbow
Propane
Plate installation
IIc Prepare boiler orifice plate
Natural gas
Bottom side of boiler front section
IId Prepare boiler high altitude kit
When required
White Hose Red
Altitudes above 5,500 feet only
IIe Prepare boiler place in position
Rotate
Fill and pressure test
IIf Prepare boiler pressure test
Perform hydrostatic pressure test
Prepare boiler for test Fig
Piping connections for hydrostatic test
For heating system with See pages 27 30
IIIa Water piping overview
IIIb Water piping relief valve
Install relief valve
Expansion tank
IIIc Water piping boiler connections
Supply & return connections
Air separator
Piping closed
Zoning with circulators
IIId Water piping all systems
Baseboard system piping
IIIe Water piping baseboard system
Radiator system piping
IIIf Water piping radiator system
IIIg Water piping single-zone radiant or heat pump system
IIIh Water piping multi-zone radiant system
Outdoor reset control
Multi-zone radiant heating system piping
Manual bypass valves for fixed temp operation only
IIIi Water piping snow melt system
Water chiller systems
IIIj Water piping water chiller systems
IV Venting and combustion air
Gas piping
Connecting gas supply piping to boiler
Propane Gas
Feet
Thermostats
VI Field wiring
Electrical installation must comply with
Wiring connections
Field wiring Factory wiring
Verify water chemistry
Freeze protection when used
VIIa Start-up overview
VIIb Start-up preparation
Fill the system with water
VIIb Start-up preparation
Verify gas/air orifice plate
Check for gas leaks
Start the boiler
VIIc Start-up read Section
VIId Start-up to operate boiler
Perform final checks before starting boiler
VIIe Start-up if boiler doesn’t start
VIId Start-up operate boiler
VIIf Start-up altitude over 5,500 feet only
Connect and adjust manometer
Check Gas Control Set Point
At Least Inches
Check-out procedure checklist
VIIIa Check-out procedure overview
VIIIb Check-out procedure checklist
IXa Operation overview
Shows the ladder wiring diagram for the GV series 3 boiler
Steps
IXb Operation sequence
Ladder diagram legend
IXb Operation wiring diagrams
GCM
IXc Operation lighting instructions
For Your Safety Read Before Operating
White-Rodgers gas valve model 36E
Xa Service and maintenance overview
Service technician
Xb Service and maintenance schedule
Annual start-up only by qualified service technician
Xc Service & maintenance annual start-up
Start-up
Annual start-up check/test
Xc Service & maint. annual start-upcont
Gauges
Expansion tank
Igniter
Boiler relief valve
Annual start-up owner review
Review with owner
Condensate drain line Check valve assembly
To remove the blower assembly
Igniter
XIa Troubleshooting overview
Before troubleshooting
XIb Troubleshooting procedures
Check the following
Checking the air pressure switch
XIc Troubleshooting air pressure switch
Gas Valve
XId Troubleshooting servicing tips
Blower Housing
Igniter
Control Module
XIe Troubleshooting control module
Power
Symptom Common Causes Possible Corrections
XIf Troubleshooting common problems
Symptom Common Causes Possible Corrections
Chart 1 Troubleshooting Power light status
XIg Troubleshooting GCM lights
Chart 2 Tstat Circ & Power lights flashing
Chart 3 Limit & Power lights flashing
Chart 4 Pres Switch & Power lights flashing
Chart 5 Flame & Power lights flashing
Chart 6 Tstat Circ light flashing and Power light on steady
Chart 7 Limit light flashing and Power light on steady
Is thermostat circuit closed continuity across wires?
XIIa Replacement parts overview
Water trim bag assembly #1
XIIb Replacement parts accessory bag
Description Model Weil-McLain Number Part number
XIIc Replacement parts section assembly
85041
422-200-228
XIId Replacement parts jacket assembly
85042
382-200-340
XIIe Replacement parts Blower assembly
Vent starter tee not included
Description Weil-McLain Number Part number
XIIf Replacement parts trim assembly
85048
XIIg Replacement parts interior panel
Interior panel
Number
Xiii Dimensions and ratings
DOE
Gold GV Water boiler Series
Top
Page
Image
Contents