Weil-McLain 550-141-850/0599 IXb Operation — sequence, Steps, Standby, Call for heat, Limit cycle

Models: GOLD DV WATER BOILER 550-141-850/0599

1 96
Download 96 pages 38.64 Kb
Page 51
Image 51
IXb Operation — sequence

• Installation • Start-Up • Parts • Maintenance

IXb Operation — sequence

Figure 22 Ignition control module sequence of operation — status light indications

Steps

 

POWER TSTAT

LIMIT

PRESS FLAME

 

Call for

CIRC

 

SWITCH

Timing

 

 

 

 

 

heat?

 

 

 

 

(Following step 8, cycle goes back to step 1.)

 

 

 

 

 

 

 

 

 

 

 

 

1.

Standby

NO

 

 

 

 

· Waiting for call for heat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

Call for heat

 

 

 

 

 

 

· Circulator on

YES

 

 

 

· Blower on

3.Limit circuit

·

Limit controls closed

YES

· Block switch contacts closed

 

 

 

 

 

4. Pressure circuit

 

 

·

Pressure switch contacts closed

YES

35 sec

 

 

·Igniter heating

5.Flame proven

·Gas valve open

·

Ignitor remains on

YES

6 sec

 

 

·

Boiler producing heat

 

 

 

 

 

6. Limit cycle

 

 

·

Limit circuit open

YES

· Gas valve closed

7.Flame outage *

· Flame out

YES

· Boiler recycles

8.Thermostat satisfied

· Circulator off

NO

30 sec

·Blower postpurge

or

= "ON"

= "OFF"

*If flame is not proven in 4 seconds, boiler recycles 2 times to retry for ignition before going into lockout. Recycle igniter timing is 30 seconds. Postpurge and prepurge are performed on every cycle. In event of lockout, ignition control will automatically restore sequence of operation after either:

1 hour waiting period.

Opening and closing of thermostat circuit.

Removal of 120 VAC power for at least 45 seconds.

85050

Part number 550-141-850/0699

51

Page 51
Image 51
Weil-McLain 550-141-850/0599 IXb Operation — sequence, Steps, • Installation • Start-Up• Parts • Maintenance, Standby