Baldor TS400, TS25, TS45 Recommended Engine Oil and Battery Type, Oil & Battery Recommendations

Page 21

Recommended Engine Oil and Battery Type

When replacing batteries, use only the recommended battery for your generator, see Table 3-5.

Table 3-5 Oil & Battery Recommendations

MODEL

SUMMER

WINTER

OIL

RECOMMENDED

(AMPS) COLD

OIL

OIL

CAPACITY

BATTERY

CRANKING

 

 

 

 

 

 

 

TS25

SAE. 20W/50

5W/30

8.6 QTS

BCI Group 24

925

 

 

 

 

 

 

TS35

SAE. 20W/50

5W/30

8.5 QTS

BCI Group

925

 

 

 

 

 

 

TS45

SAE. 20W/50

5W/30

11.8 QTS

BCI Group

925

 

 

 

 

 

 

TS60

SAE. 20W/50

5W/30

11.8 QTS

BCI Group

925

 

 

 

 

 

 

TS80

SAE. 20W/50

5W/30

14.0 QTS

BCI Group

925

 

 

 

 

 

 

TS130

SAE. 20W/50

5W/30

18.0 QTS

BCI Group

(2) 750

 

 

 

 

 

 

TS175

SAE. 20W/50

5W/30

34.0 QTS

BCI Group

(2) 750

 

 

 

 

 

 

TS250

SAE. 20W/50

5W/30

34.0 QTS

BCI Group

(2) 750

 

 

 

 

 

 

TS400

SAE. 20W/50

5W/30

45.0 QTS

BCI Group

(2) 750

 

 

 

 

 

 

Post Installation Checks

When the initial installation is complete, these checks must be performed before starting the engine. These checks are not required before each start, only after the initial installation.

1.Generators that have been in transit or storage for long periods may be subjected to extreme temperature and moisture changes. This can cause excessive condensation, and the generator windings should be thoroughly dried before bringing the generator up to full nameplate voltage. If this precaution is not taken, serious damage to the generator can result.

Caution: Do not apply high voltage to windings (do not start the generator) in a moisture−saturated condition. Moisture can cause insulation breakdown, making it necessary to return the generator to the factory for repair, and consequent expense and loss of time.

Note: These precautions are especially necessary in locations such as seaboard installations and other high humidity areas. Some installations will be in atmospheres that are much more corrosive than others. Prevention of a failure is better than being forced to make a repair.

2.Verify that the transfer switch is in Utility Power mode. No power must be present at the generator or transfer switch connections. Verify with a voltmeter.

3.Verify that the engine starting battery is disconnected so accidental starting is not possible.

4.Verify generator is securely mounted and anchored to cement pad (skid mount only).

5.Verify that proper clearance exists on all sides and top of enclosure.

6.Verify no debris (buildup of leaves, grass, sand, snow, etc.) is present.

7.Assure generator is a safe distance from any flammable or combustible material.

8.Verify that the three phase generator power (L1, L2, L3 and N) are properly connected to the transfer switch.

9.Verify that the generator and transfer switch load are voltage compatible.

10.Verify that no load is connected to the circuit breaker and/or transfer switch.

11.Inspect the engine and generator and verify that there are no loose wires or components. Tighten if necessary.

12.Verify that the ground conductor is of correct wire size and properly connected.

13.Verify engine oil level is full. Refer to engine manual if necessary.

14.Verify engine coolant level is full. Refer to engine manual if necessary.

15.Verify exhaust system to assure it is in properly connected and pointing away from occupied living space, air entry routes (doors, windows, vents etc.) and combustible materials.

MN2417

Receiving & Installation 3-9

Image 21
Contents Tier 2/3 Towable Generators Trailer and Skid Mounted California Proposition 65 Warning Table of Contents Ii Table of Contents MN2417 Read This Manual Thoroughly Section Product Safety InformationPrecaution Statements Used In This Manual PropertyOperation Statements On next MN2417 Product Safety Information Operation Statements Burn Statements Installation Statements Installation Statements Maintenance Statements Product Safety Information MN2417 Labor Parts Limited WarrantyGeneral Information MN2417 Section Receiving & Installation Generator Mounting Skid Installation Hot Exhaust GassesFuel Connections Standby Power Ratings Prime Power RatingsProtection Receptacle Panel Single Phase Single Phase Connections Transfer Switch Considerations Three Phase Connections Battery Charger Considerations General Wiring ConsiderationsFrame Ground Connection Battery Installation Recommended Engine Oil and Battery Type Oil & Battery RecommendationsPost Installation Checks Post Installation Checks Towing the Generator Selecting the Proper Towing EquipmentTow Vehicle Tow Hitch Capacity Towing Heavy Trailer Loads Trailer Component Identification Lug Nut Tightening Specifications Page Receptacle Panel Load Connections, see Figure Three/Single Phase OperationOperator Control Panel Components Voltage Reconnect and AdjustmentManual Start Procedure Manual Stop ProcedureAuto Start Procedure Digital Engine Controller Description EM0046A21 MRS17 Alarm & Warning ConditionsMAN Mode OFF ModeAUT Mode Measurement MenuAdjustment Menu Alarm ListECU Alarm List Sensor fail FLS see Table Shut down SD see TablePossible Warnings Inputs and Outputs Binary InputsBinary outputs Set points Basic Setpoints Analog Inputs10 Engine Setpoints Stabil Time11 Engine Protect Setpoints 10Engine Setpoints12 Generator Protect Setpoints 14 IOM/PTM Module Setpoints 13 Sensor Spec Setpoints+ D+ Jdic Engine GeneralTroubleshooting Guide Problems and SolutionsLoad too large for unit 1Troubleshooting GuideTroubleshooting and Maintenance MN2417 Part number Appendix a Wiring DiagramsFigure A-1 TS25 Connection Diagram Figure A-2 TS25 Connection Diagram Figure A-3 TS25 Connection Diagram Figure A-4 TS25 Connection Diagram Figure A-5 TS25 Connection Diagram Figure A-6 TS25 Connection Diagram Figure A-7 TS35 Connection Diagram Figure A-8 TS35 Connection Diagram Figure A-9 TS35 Connection Diagram Figure A-10 TS35 Connection Diagram Figure A-11 TS35 Connection Diagram Figure A-12 TS35 Connection Diagram Figure A-13 TS35 Power Connection Diagram Figure A-14 TS60 Connection Diagram Figure A-15 TS60 Connection Diagram Figure A-16 TS60 Connection Diagram Figure A-17 TS60 Connection Diagram Figure A-18 TS60 Connection Diagram Figure A-19 TS60 Connection Diagram Figure A-20 TS60 Connection Diagram Figure A-21 TS80 Connection Diagram Figure A-22 TS80 Connection Diagram Figure A-23 TS80 Connection Diagram Figure A-24 TS80 Connection Diagram Figure A-25 TS80 Connection Diagram Figure A-26 TS80 Connection Diagram Figure A-27 TS80 Connection Diagram Figure A-28 TS80 Connection Diagram Figure A-29 TS80 Connection Diagram Figure A-30 TS80 Connection Diagram Figure A-31 TS400 Connection Diagram Figure A-32 TS400 Connection Diagram Figure A-33 TS400 Connection Diagram Figure A-34 TS400 Connection Diagram Figure A-35 TS400 Connection Diagram Figure A-36 TS400 Connection Diagram Figure A-37 TS400 Connection Diagram Figure A-38 TS400 Connection Diagram Figure A-39 TS400 Connection Diagram Baldor District Offices Baldor Electric Company
Related manuals
Manual 55 pages 54.09 Kb