Baldor TS45, TS60, TS400, TS80, TS175, TS130, TS35, TS250 manual Stabil Time, Engine Setpoints

Page 37

 

Table 4-10 Engine Setpoints

 

 

 

Start RPM

 

“Firing” speed when iL controller stops cranking (starter goes OFF).

 

 

Step: 1% of nominal RPM; Range: 5 − 50 %

 

 

 

Starting POil

 

When reached controller stops cranking (starter goes OFF).

 

 

Step: 0,1 psi; Range: −100 − 10000

 

 

Note: There are three conditions for stop cranking: Starting RPM,

 

 

StartingPOil and D+ (when enabled). Starter goes off when any

 

 

of these conditions is valid.

 

 

 

Prestart time

 

Time of closing of the PRE−START output prior to the engine start.

 

 

Set to zero if you want to leave the output PRE−START open.

 

 

Step: 1s; Range: 0 − 600 s

 

 

 

MaxCrank time

 

Maximum time limit of cranking. Step: 1s; Range: 1 − 60 s

CrnkFail pause

 

Pause between crank attempts. Step: 1s; Range: 5 − 60 s

Crank attemps

 

Max number of crank attempts. Step: 1; Range: 1 − 10

Idle time

 

Idle time delay starts when RPM exceeds Start RPM . Start fail is detected

 

 

when during Idle state RPM decreases below 2.

 

 

During the Idle time timer running the binary output IDLE/NOMINAL is

 

 

opened, when it elapses the IDLE/NOMINAL output closes.

 

 

Binary output IDLE/NOMINAL opens during Cooling period again.

 

 

Step: 1 s; Range: 0 − 600 s

 

 

Note: If the IDLE function not supported on the governor, set the Idle time

 

 

nevertheless to minimum 5s to avoid Underspeed possibly

 

 

caused by instability of the engine short after start.

 

 

 

GCB CloseDelay

 

GCB can be closed earliest GCB CloseDelay after Stabil time when all

 

 

electric values are in overunder voltage and over−under frequency limits.

 

 

Step: 1 s; Range: 0 − 300 s

 

 

 

Stabil time

 

Generator Nominal voltage is detected during genset start after starter is

 

 

switched off and Idle time elapses. Electric generator protections are

 

 

active since detection. Step: 1 s; Range: 0 − 300 s

 

 

 

MinStpValvTime

 

Binary output Stop solenoid closes when stop sequence begins and

 

 

closes at least for MinStpValvTime. Example MinStpValvTime = 20 sec.

 

 

a) When engine stops (RPM=0) in 10 seconds, Binary output Stop

 

 

solenoid still stays closed for 10 sec.

 

 

b) When engine stops in 30 seconds, Binary output Stop solenoid opens

 

 

10 seconds after RPM=0 and Vg =0 and Oil pressure = 0. Those 10 sec is

 

 

fix time for safe stop. Step: 1s; Range: 0 − 180 s

 

 

Note: Stop of engine is detected when all following conditions are met:

 

 

RPM =0, Oil pressure < StartingPOil and Generator voltage < 10 VAC.

 

 

Stop fail is detected when is difference between those conditions, e.g

 

 

RPM=O and Generator voltage > 10V.

RPM

Start RPM

RPM

 

 

RPM = 2

Idle Function

B O S tarter

 

B O IDLE /RA T E D

 

 

 

 

 

 

 

 

 

Idle tim e

M in stab tim e

 

 

 

Electric protections

 

 

 

Start Fail

 

 

 

 

 

activ e

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Stabil Time

MN2417

Operation 4-15

Image 37
Contents Tier 2/3 Towable Generators Trailer and Skid Mounted California Proposition 65 Warning Table of Contents Ii Table of Contents MN2417 Read This Manual Thoroughly Section Product Safety InformationProperty Precaution Statements Used In This ManualOperation Statements On next MN2417 Product Safety Information Operation Statements Burn Statements Installation Statements Installation Statements Maintenance Statements Product Safety Information MN2417 Labor Parts Limited WarrantyGeneral Information MN2417 Section Receiving & Installation Generator Mounting Skid Hot Exhaust Gasses InstallationFuel Connections Prime Power Ratings Standby Power RatingsProtection Receptacle Panel Single Phase Single Phase ConnectionsTransfer Switch Considerations Three Phase ConnectionsBattery Charger Considerations General Wiring ConsiderationsFrame Ground Connection Battery Installation Oil & Battery Recommendations Recommended Engine Oil and Battery TypePost Installation Checks Post Installation Checks Selecting the Proper Towing Equipment Towing the GeneratorTow Vehicle Tow Hitch Capacity Towing Heavy Trailer Loads Trailer Component Identification Lug Nut Tightening Specifications Page Receptacle Panel Load Connections, see Figure Three/Single Phase OperationOperator Control Panel Components Voltage Reconnect and AdjustmentManual Stop Procedure Manual Start ProcedureAuto Start Procedure Digital Engine Controller Description EM0046A21 MRS17 Alarm & Warning ConditionsMAN Mode OFF ModeAUT Mode Measurement MenuAlarm List Adjustment MenuECU Alarm List Shut down SD see Table Sensor fail FLS see TablePossible Warnings Binary Inputs Inputs and OutputsBinary outputs Set points Basic Setpoints Analog Inputs10 Engine Setpoints Stabil Time11 Engine Protect Setpoints 10Engine Setpoints12 Generator Protect Setpoints 14 IOM/PTM Module Setpoints 13 Sensor Spec Setpoints+ D+ Jdic Engine GeneralTroubleshooting Guide Problems and SolutionsLoad too large for unit 1Troubleshooting GuideTroubleshooting and Maintenance MN2417 Part number Appendix a Wiring DiagramsFigure A-1 TS25 Connection Diagram Figure A-2 TS25 Connection Diagram Figure A-3 TS25 Connection Diagram Figure A-4 TS25 Connection Diagram Figure A-5 TS25 Connection Diagram Figure A-6 TS25 Connection Diagram Figure A-7 TS35 Connection Diagram Figure A-8 TS35 Connection Diagram Figure A-9 TS35 Connection Diagram Figure A-10 TS35 Connection Diagram Figure A-11 TS35 Connection Diagram Figure A-12 TS35 Connection Diagram Figure A-13 TS35 Power Connection Diagram Figure A-14 TS60 Connection Diagram Figure A-15 TS60 Connection Diagram Figure A-16 TS60 Connection Diagram Figure A-17 TS60 Connection Diagram Figure A-18 TS60 Connection Diagram Figure A-19 TS60 Connection Diagram Figure A-20 TS60 Connection Diagram Figure A-21 TS80 Connection Diagram Figure A-22 TS80 Connection Diagram Figure A-23 TS80 Connection Diagram Figure A-24 TS80 Connection Diagram Figure A-25 TS80 Connection Diagram Figure A-26 TS80 Connection Diagram Figure A-27 TS80 Connection Diagram Figure A-28 TS80 Connection Diagram Figure A-29 TS80 Connection Diagram Figure A-30 TS80 Connection Diagram Figure A-31 TS400 Connection Diagram Figure A-32 TS400 Connection Diagram Figure A-33 TS400 Connection Diagram Figure A-34 TS400 Connection Diagram Figure A-35 TS400 Connection Diagram Figure A-36 TS400 Connection Diagram Figure A-37 TS400 Connection Diagram Figure A-38 TS400 Connection Diagram Figure A-39 TS400 Connection Diagram Baldor District Offices Baldor Electric Company
Related manuals
Manual 55 pages 54.09 Kb