Baldor TS400, TS25, TS45, TS60 Manual Start Procedure, Manual Stop Procedure, Auto Start Procedure

Page 30

Pre−Start Procedure Before attempting to start the generator set, several things must first be verified or performed. These are:

1.Fill system fuel tank with clean, fresh diesel fuel.

2.Fill engine crankcase to full mark with clean, fresh lubricating oil per engine manufacturer operating guide.

3.Radiator coolant should be checked at the beginning of each day and filled in compliance with the engine manufacturer’s guidelines.

4.Secure the generator for operation.

a.Skid mounted − the power generating system should be mounted to a smooth, hard surface suitable for supporting the system under all stress conditions.

b.Trailer mounted − block wheels to prevent accidental movement. Use jack (Figure 4-1) to level the generator.

c.Adequate clearance must be provided for access doors to fully open.

Note: The exhaust also exits radiator end. When positioning a generator system ensure position does not cause a concentration of toxic emissions.

5.Place voltage select switch in the correct position 208/120, 240/120 or 480/277VAC and pad lock it in position if required (Figure 4-3).

6.Carefully inspect all Individual load cables for broken insulation or other signs of damage. Never use a damaged cable. Replace it before usage.

7.L1, L2, L3, Neutral and Ground cables must be brought into load block compartment through access hole in base of enclosure.

8.Ensure that wires are properly connected and connections are secure.

9.Ensure that an external ground connection is made when required for safety.

10.Ensure that the Remote Start wires are properly connected, if used.

11.Use disconnect at the load to turn off the load. Do not start engine with load switched “On”. and warm up before load is switched on.

12.Manually start the engine, allow engine to come up to speed and perform the Voltage Reconnect and Adjustment within the allotted time.

13.Stop the engine.

Caution: Large “Engine Compartment Doors” on each side of enclosure must remain closed during operation. If doors remain open, engine will overheat due to insufficient air flow around engine.

14. Ensure that Engine Compartment doors are closed for proper ventilation.

Note: Receptacle Panel Load cables may be routed into the receptacle compartment through the Enclosure Electrical Access Panel after generator is started and has warmed up.

Operating Procedures The engine−generator controller is designed to start and stop an engine from either AUTO “Automatic” mode or Manual “NOT IN AUTO”. Refer to Figure 4-6.

Manual Start Procedure

1.Press PAGE until the “OFF AUTO MAN” display is shown.

2.Press Mode" until control is in MAN mode.

3.Press “Start”.

4.The controller will start the engine.

Manual Stop Procedure

1.Use disconnect at the load to turn OFF the load. Allow generator cool down if needed.

2.Press “Stop”. Press Mode" until control is in OFF mode.

AUTO Start Procedure

1.Press Mode" until control is in AUT mode.

In Auto mode, the generator will start when the remote start input closes.

2.In Auto mode, the generator will stop when the remote start input opens.

4-8 Operation

MN2417

Image 30
Contents Tier 2/3 Towable Generators Trailer and Skid Mounted California Proposition 65 Warning Table of Contents Ii Table of Contents MN2417 Section Product Safety Information Read This Manual ThoroughlyPrecaution Statements Used In This Manual PropertyOperation Statements On next MN2417 Product Safety Information Operation Statements Burn Statements Installation Statements Installation Statements Maintenance Statements Product Safety Information MN2417 Limited Warranty Labor PartsGeneral Information MN2417 Section Receiving & Installation Generator Mounting Skid Installation Hot Exhaust GassesFuel Connections Standby Power Ratings Prime Power RatingsProtection Single Phase Connections Receptacle Panel Single PhaseBattery Charger Considerations Three Phase ConnectionsTransfer Switch Considerations General Wiring ConsiderationsFrame Ground Connection Battery Installation Recommended Engine Oil and Battery Type Oil & Battery RecommendationsPost Installation Checks Post Installation Checks Towing the Generator Selecting the Proper Towing EquipmentTow Vehicle Tow Hitch Capacity Towing Heavy Trailer Loads Trailer Component Identification Lug Nut Tightening Specifications Page Three/Single Phase Operation Receptacle Panel Load Connections, see FigureVoltage Reconnect and Adjustment Operator Control Panel ComponentsManual Start Procedure Manual Stop ProcedureAuto Start Procedure Alarm & Warning Conditions Digital Engine Controller Description EM0046A21 MRS17AUT Mode OFF ModeMAN Mode Measurement MenuAdjustment Menu Alarm ListECU Alarm List Sensor fail FLS see Table Shut down SD see TablePossible Warnings Inputs and Outputs Binary InputsBinary outputs Analog Inputs Set points Basic SetpointsStabil Time 10 Engine Setpoints10Engine Setpoints 11 Engine Protect Setpoints12 Generator Protect Setpoints 13 Sensor Spec Setpoints 14 IOM/PTM Module Setpoints+ D+ Jdic General EngineProblems and Solutions Troubleshooting Guide1Troubleshooting Guide Load too large for unitTroubleshooting and Maintenance MN2417 Appendix a Wiring Diagrams Part numberFigure A-1 TS25 Connection Diagram Figure A-2 TS25 Connection Diagram Figure A-3 TS25 Connection Diagram Figure A-4 TS25 Connection Diagram Figure A-5 TS25 Connection Diagram Figure A-6 TS25 Connection Diagram Figure A-7 TS35 Connection Diagram Figure A-8 TS35 Connection Diagram Figure A-9 TS35 Connection Diagram Figure A-10 TS35 Connection Diagram Figure A-11 TS35 Connection Diagram Figure A-12 TS35 Connection Diagram Figure A-13 TS35 Power Connection Diagram Figure A-14 TS60 Connection Diagram Figure A-15 TS60 Connection Diagram Figure A-16 TS60 Connection Diagram Figure A-17 TS60 Connection Diagram Figure A-18 TS60 Connection Diagram Figure A-19 TS60 Connection Diagram Figure A-20 TS60 Connection Diagram Figure A-21 TS80 Connection Diagram Figure A-22 TS80 Connection Diagram Figure A-23 TS80 Connection Diagram Figure A-24 TS80 Connection Diagram Figure A-25 TS80 Connection Diagram Figure A-26 TS80 Connection Diagram Figure A-27 TS80 Connection Diagram Figure A-28 TS80 Connection Diagram Figure A-29 TS80 Connection Diagram Figure A-30 TS80 Connection Diagram Figure A-31 TS400 Connection Diagram Figure A-32 TS400 Connection Diagram Figure A-33 TS400 Connection Diagram Figure A-34 TS400 Connection Diagram Figure A-35 TS400 Connection Diagram Figure A-36 TS400 Connection Diagram Figure A-37 TS400 Connection Diagram Figure A-38 TS400 Connection Diagram Figure A-39 TS400 Connection Diagram Baldor District Offices Baldor Electric Company