Baldor TS45, TS25 Three/Single Phase Operation, Receptacle Panel Load Connections, see Figure

Page 28

Table 4-2 Three/Single Phase Operation

 

Alternator

Voltage

 

 

Voltage at Terminal Lugs

 

 

Voltage at Plug Receptacles

 

 

 

 

 

 

 

 

 

 

 

 

Switch

Line To Line Voltage

Line To Neutral Voltage

120VAC

240VAC Receptacles

Winding

Adjust

Position

Receptacles

(Twist Lock)

Connection

Position

 

 

 

 

 

 

 

 

 

 

 

L1−L2

L2−L3

 

L1−L3

L1−N

 

L2−N

L3−N

L−N

L−L

L−N

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Series High

Minimum

416

416

 

416

240

 

240

240

120

208

120

 

 

 

 

 

 

 

 

 

 

 

 

 

480/277

Middle

460

460

 

460

266

 

266

266

133

230

133

Wye

 

 

 

Maximum

480

480

 

480

277

 

277

277

139

240

139

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Parallel Low

Minimum

208

208

 

208

120

 

120

120

120

208

120

 

 

 

 

 

 

 

 

 

 

 

 

 

208/120

Middle

230

230

 

230

133

 

133

133

133

230

133

Wye

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Maximum

240

240

 

240

139

 

139

139

139

240

139

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Parallel Low

Minimum





 

200

100

 



100

100

200

100

 

 

 

 

 

 

 

 

 

 

 

 

 

240/120

Middle





 

220

110

 



110

110

220

110

ZigZag

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Maximum





 

240

120

 



120

120

240

120

 

 

 

 

No connection at Terminal Lug #2.

Receptacle Panel Load Connections, see Figure 4-4.

1.240/120VAC voltage is present at the receptacle panel at all times when generator is running.

2.Carefully inspect all Individual load cables for broken insulation or other signs of damage. Never use a damaged cable. Replace it before usage.

3.Individual load cables may be routed into the receptacle compartment through the Enclosure Electrical Access Panel.

4.Individual load cables may be connected or disconnected while generator is running. Use extreme care not to touch any electrical wire or terminal to avoid shock hazard.

5.Keep Enclosure Electrical Access Panel closed at all times. This prevents rain or other harmful elements from entering the compartment. Output metering and gauges can be observed through the window in the Enclosure Electrical Access Panel.

Figure 4-4 Receptacle Panel (Single Phase)

Circuit Breakers (Single or Double pole)

Circuit Breakers provides protection on some units. To reset a breaker, place it in the OFF then the ON position.

Note:

Single phase power is always available.

 

 

(GOLD)

(GOLD)

 

 

Y

X

 

 

X

 

 

 

CS6369

 

 

125/250V

Reset

Test

Y 50A

W

 

 

 

 

 

G

 

 

W

 

 

CS6365N

(SILVER)

 

GFI Outlet

240V, 50A

 

120V, 20A

 

 

Meters, switches, lights and other operator control components are located in various places on each panel. Figure 4-5can be used to identify the function and features of each operator control regardless of where it is located on your panel.

4-6 Operation

MN2417

Image 28
Contents Tier 2/3 Towable Generators Trailer and Skid Mounted California Proposition 65 Warning Table of Contents Ii Table of Contents MN2417 Section Product Safety Information Read This Manual ThoroughlyProperty Precaution Statements Used In This ManualOperation Statements On next MN2417 Product Safety Information Operation Statements Burn Statements Installation Statements Installation Statements Maintenance Statements Product Safety Information MN2417 Limited Warranty Labor PartsGeneral Information MN2417 Section Receiving & Installation Generator Mounting Skid Hot Exhaust Gasses InstallationFuel Connections Prime Power Ratings Standby Power RatingsProtection Single Phase Connections Receptacle Panel Single PhaseThree Phase Connections Transfer Switch ConsiderationsBattery Charger Considerations General Wiring ConsiderationsFrame Ground Connection Battery Installation Oil & Battery Recommendations Recommended Engine Oil and Battery TypePost Installation Checks Post Installation Checks Selecting the Proper Towing Equipment Towing the GeneratorTow Vehicle Tow Hitch Capacity Towing Heavy Trailer Loads Trailer Component Identification Lug Nut Tightening Specifications Page Three/Single Phase Operation Receptacle Panel Load Connections, see FigureVoltage Reconnect and Adjustment Operator Control Panel ComponentsManual Stop Procedure Manual Start ProcedureAuto Start Procedure Alarm & Warning Conditions Digital Engine Controller Description EM0046A21 MRS17OFF Mode MAN ModeAUT Mode Measurement MenuAlarm List Adjustment MenuECU Alarm List Shut down SD see Table Sensor fail FLS see TablePossible Warnings Binary Inputs Inputs and OutputsBinary outputs Analog Inputs Set points Basic SetpointsStabil Time 10 Engine Setpoints10Engine Setpoints 11 Engine Protect Setpoints12 Generator Protect Setpoints 13 Sensor Spec Setpoints 14 IOM/PTM Module Setpoints+ D+ Jdic General EngineProblems and Solutions Troubleshooting Guide1Troubleshooting Guide Load too large for unitTroubleshooting and Maintenance MN2417 Appendix a Wiring Diagrams Part numberFigure A-1 TS25 Connection Diagram Figure A-2 TS25 Connection Diagram Figure A-3 TS25 Connection Diagram Figure A-4 TS25 Connection Diagram Figure A-5 TS25 Connection Diagram Figure A-6 TS25 Connection Diagram Figure A-7 TS35 Connection Diagram Figure A-8 TS35 Connection Diagram Figure A-9 TS35 Connection Diagram Figure A-10 TS35 Connection Diagram Figure A-11 TS35 Connection Diagram Figure A-12 TS35 Connection Diagram Figure A-13 TS35 Power Connection Diagram Figure A-14 TS60 Connection Diagram Figure A-15 TS60 Connection Diagram Figure A-16 TS60 Connection Diagram Figure A-17 TS60 Connection Diagram Figure A-18 TS60 Connection Diagram Figure A-19 TS60 Connection Diagram Figure A-20 TS60 Connection Diagram Figure A-21 TS80 Connection Diagram Figure A-22 TS80 Connection Diagram Figure A-23 TS80 Connection Diagram Figure A-24 TS80 Connection Diagram Figure A-25 TS80 Connection Diagram Figure A-26 TS80 Connection Diagram Figure A-27 TS80 Connection Diagram Figure A-28 TS80 Connection Diagram Figure A-29 TS80 Connection Diagram Figure A-30 TS80 Connection Diagram Figure A-31 TS400 Connection Diagram Figure A-32 TS400 Connection Diagram Figure A-33 TS400 Connection Diagram Figure A-34 TS400 Connection Diagram Figure A-35 TS400 Connection Diagram Figure A-36 TS400 Connection Diagram Figure A-37 TS400 Connection Diagram Figure A-38 TS400 Connection Diagram Figure A-39 TS400 Connection Diagram Baldor District Offices Baldor Electric Company