removing/installing server components (continued)
removing the PCI
replacing the backup battery, 48 safety and regulatory requirements, 24 safety compliance, 24
tools needed, 24 warnings and cautions, 21
reset system, 53, 67 resume on ring, 18 riser
riser and
S
safety and regulatory requirements, 24 safety compliance, 24
serial ports, 15
server, removing/installing components, 21 server board, 8, 9
chipset, 13 components, figure, 9 connectors, 9 Ethernet controllers, 17 fan support, 20 hardware monitor, 16 I/O controller, 15 IDE support, 14
IDE support, 14 memory, 11 power connector, 19 processors, 11
resume on ring, 18
SCSI hard drive LED connector, 17 SMI and NMI routing, 19 speaker, 19
USB, 13
wake on LAN, 17 wake on ring, 18
service, no
Setup, changing configuration, 53 SMI, 19
SMI and NMI routing, 19 soft boot, 67
speaker, 19
switches, power on/off, 22 Switches, DC power, 67
reset, 67 system components, 7
server, 7
T - U
tools needed, 24 upgrade Flash utility, 63 USB, 13
utilities
BIOS update, 53 Setup, 53
W
Wake on LAN, 17 Wake on Ring, 18 Warning
components may be hot, 27 disconnect power cords, cables, 22 dispose of lithium battery safely, 48
no
warnings and cautions, 21
80 | Intel ISP1100 Internet Server Product Guide |