Cisco Systems ONS 15600 SDH manual 18-45

Page 45

Chapter 18 DLPs F300 to F399

DLP- F342 MS-SPRing Switch Test

Step 11 Clear the switch on the west port:

a.Right-click the west port of the MS-SPRing node where you invoked the Force Ring switch and choose Set West Protection Operation.

b.In the Set West Protection Operation dialog box, choose CLEAR from the drop-down list.

c.Click OK.

d.Click Yes in the Confirm MS-SPRing Operation dialog box.

On the network view graphic, the Force Ring switch is removed, the F indicating the switch is removed, and the span lines between MS-SPRing nodes will be purple and green. The span lines might take a few moments to change color.

Step 12 In network view, click the Conditions tab. Verify that all conditions raised in this procedure are cleared from the network. If unexplained conditions appear, resolve them before continuing.

Step 13 Verify the MS-SPRing line status on each node:

a.From the View menu, choose Go to Node View.

a.Click the Maintenance > MS-SPRing tabs.

b.Verify that the line states are shown as Act/Stby on both the east and west sides of each node in the ring.

Step 14 Initiate a Force Ring switch on the east port:

a.Right-click the east port of MS-SPRing node and choose Set East Protection Operation.

b.In the Set East Protection Operation dialog box, choose FORCE RING from the drop-down list.

c.Click OK.

d.Click Yes in the two Confirm MS-SPRing Operation dialog boxes that appear.

On the network view graphic, an F appears on the working MS-SPRing channel where you invoked the Force Ring switch. The MS-SPRing span lines are purple where the Force Ring switch was invoked, and all span lines between other MS-SPRing nodes are green. The span lines might take a few moments to change color.

Step 15 Verify the conditions:

a.Click the Conditions tab.

b.Click Retrieve.

c.Verify that the following conditions are reported on the node where you invoked the Force Ring switch on the east port:

FORCE-REQ-RING—A Force Switch Request On Ring condition is reported against the span’s working slot on the east side of the node.

RING-SW-WEST—A Ring Switch Active on the west side condition is reported against the working span on the east side of the node.

Note Make sure the Filter button in the lower right corner of the window is off. Click the Node column to sort conditions by node.

d.Verify that the following conditions are reported on the node that is connected to the East line of the node where you performed the switch:

FE-FRCDWKSWPR-RING—A Far-End Working Facility Forced to Switch to Protection condition is reported against the working span on the west side of the node.

 

 

Cisco ONS 15600 SDH Procedure Guide, R8.0

 

 

 

 

 

 

October 2007

 

 

18-45

 

 

 

 

 

Image 45
Contents 18-1 DLP-F300 Install Fiber-Optic Cables for Sncp Configurations18-2 DLP-F302 Change Tunnel TypeDLP-F303 Delete Overhead Circuits Click the Provisioning Overhead Circuits tabs18-3 18-4 DLP-F304 Repair an IP Tunnel18-5 J1 Function CardsSelecting the Edit Path Trace Option 18-618-7 DLP-F306 Provision Path Trace on STM-N Ports Click Circuits18-8 Click the Login Node Group tab DLP-F307 Create Login Node GroupsClick Create Group 18-918-10 Tools18-11 DLP-F310 Change the JRE Version18-12 DLP-F311 Remove Pass-through ConnectionsDLP-F312 Delete a Node from a Specified Login Node Group DLP-F313 Change a Circuit Service State18-13 18-14 DLP-F314 Provision MS-DCC Terminations18-15 Node view, click the Provisioning Comm Channels MS-DCC tabsDLP-F315 Provision a Proxy Tunnel Click the Provisioning Network Proxy subtabs18-16 DLP-F316 Provision a Firewall Tunnel Click the Provisioning Network Firewall subtabs18-17 DLP-F317 Delete a Proxy Tunnel DLP-F318 Delete a Firewall Tunnel18-18 DLP-F320 Change an MS-DCC Termination DLP-F319 Change an RS-DCC TerminationClick the Provisioning Comm Channels RS-DCC tabs Click the Provisioning Comm Channels MS-DCC tabsDLP-F322 Delete an MS-DCC Termination DLP-F321 Delete an RS-DCC TerminationNode view, click the Provisioning Comm Channel RS-DCC tabs 18-2018-21 Click the Provisioning Comm Channel MS-DCC tabsDLP-F324 Provision Asap Ethernet Ports Click the Provisioning Ethernet Ports tabs18-22 Click the Performance Ethernet Ether Ports Statistics tabs DLP-F325 Provision Asap POS PortsClick the Provisioning Ethernet POS Ports tabs 18-23Click the Performance Ethernet POS Ports Statistics tabs DLP-F326 View Asap STM-N PM ParametersClick the Performance Optical tabs Figure 18-2418-25 DLP-F327 View Asap Ether Ports Statistics PM ParametersEther Ports Statistics in the Card View Performance Window 18-2618-27 DLP-F328 View Asap Ether Ports Utilization PM Parameters18-28 DLP-F329 View Asap POS Ports Statistics PM Parameters18-29 DLP-F330 View Asap POS Ports Utilization PM Parameters18-30 DLP-F331 View Asap POS Ports History PM Parameters18-31 DLP-F332 Change Node Access and PM Clearing Privilege18-32 18-33 DLP-F333 Install the Asap Carrier Modules18-34 DLP-F334 Verify Pass-Through Circuits18-35 DLP-F335 Preprovision an SFP18-36 DLP-F336 Print CTC Data18-37 DLP-F337 View Asap Ether Ports History PM Parameters18-38 Click the Provisioning MS-SPRing tabs Click Create MS-SPRing18-39 18-40 DLP-F339 Create a Two-Fiber MS-SPRing Manually18-41 DLP-F340 Change an MS-SPRing Node ID18-42 DLP-F341 MS-SPRing Exercise Ring Test18-43 DLP-F342 MS-SPRing Switch TestClick the Maintenance MS-SPRing tabs Click Retrieve18-44 18-45 18-46 DLP-F344 Initiate an MS-SPRing Manual Ring Switch DLP-F343 Provision an STM-N Circuit Route18-47 DLP-F345 Clear an MS-SPRing Manual Ring Switch Onsite/Remote Onsite Security Level Provisioning or higher18-48 18-49 DLP-F346 Create an MS-SPRing on a Single Node18-50 DLP-F347 Initiate an MS-SPRing Force Ring Switch18-51 DLP-F348 View Circuit InformationDRI 2F-PCAPCA Sncp18-53 Pendingmerge Droppending18-54 18-55 11 Connecting Fiber to a Four-Node, Two-Fiber MS-SPRing18-56 DLP-F350 Delete an MS-SPRing from a Single Node12 Selecting Single Roll Attributes 18-5714 Selecting a New Endpoint 18-5815 Viewing the Rolls Tab 18-5918-60 18-61 18-62 Click the Circuits tab17 Selecting Dual Roll Attributes 18-6318-64 18 Setting Roll Routing Preferences18-65 18-66 18-67 18-68 DLP-F356 Delete a Roll Click the Circuits Rolls tabs18-69 DLP-F357 Cancel a Roll DLP-F358 Provision a Multirate PPM18-70 DLP-F359 Change the Optical Line Rate Click the Provisioning Pluggable Port Modules tabs18-71 18-72 DLP-F360 Delete a PPM18-73 DLP-F361 Provision OSI Routing ModeNode view, click the Provisioning OSI Tarp Config tabs DLP-F362 Provision or Modify Tarp Operating Parameters18-74 18-75 Node view, click the Provisioning OSI Tarp Static TDC tabs Click Add Static Entry18-76 DLP-F365 Add a Tarp Manual Adjacency Table Entry Click Delete Static Entry18-77 Click the Provisioning OSI Routers Setup tabs DLP-F366 Provision OSI Routers18-78 DLP-F368 Enable the OSI Subnet on the LAN Interface DLP-F367 Provision Additional Manual Area Addresses18-79 DLP-F369 Create an IP-Over-CLNS Tunnel Click the Provisioning OSI Tunnels tabs18-80 18-81 DLP-F370 Remove a Tarp Manual Adjacency Table Entry18-82 DLP-F371 Change the OSI Routing Mode18-83 DLP-F372 Edit the OSI Router ConfigurationDLP-F374 Edit an IP-Over-CLNS Tunnel DLP-F373 Edit the OSI Subnetwork Point of AttachmentNode view, click the Provisioning OSI Routers Subnet tabs 18-8418-85 DLP-F375 Delete an IP-Over-CLNS Tunnel18-86 DLP-F376 View IS-IS Routing Information BaseDLP-F377 View ES-IS Routing Information Base DLP-F378 Manage the Tarp Data Cache18-87 18-88 DLP-F379 Export CTC Data19 Selecting CTC Data for Export 18-8918-90 DLP-F380 Configure the Node for Radius Authentication20 Radius Server Tab 18-91DLP-F381 Delete a Server Trail Click the Provisioning Server Trails tabs18-92 DLP-F383 Download an Alarm Severity Profile DLP-F382 Grant Superuser Privileges to a Provisioning User18-93 18-94 18-95 DLP-F384 Install the Asap 1PIO and 4PIO PIM Modules22 1PIO Module Faceplate 18-9618-97 DLP-F385 Consolidate Links in Network View18-98 24shows a network view with unconsolidated DCC and PPC linksALL Dwdm GCC, OTS, PPC TDM18-99 DLP-F386 Adjust the Java Virtual Memory Heap Size DLP-F387 Install an SFP/XFP18-100 18-101 DLP-F388 Remove an SFP/XFP18-102 DLP-F389 Remove a 1PIO or 4PIO PIM ModuleAsap 4PIO DLP-F390 Provision an Optical Line Rate and Wavelength1PIO Click the Provisioning Optical Line tabsDLP-F391 Install Alarm Wires on the CAP/CAP2 CAP/CAP218-104 27 Rear of the ONS 15600 SDH, Including the CAP/CAP2 18-10528 CAP/CAP2 Faceplate and Connections 18-10618-107 DLP-F392 Change Line Transmission Settings for STM-N CardsSF BER SD BER18-108 18-109 SonetSets STU18-110 18-111 DLP-F393 Change Threshold Settings for STM-N Ports18-112 18-113 DLP-F394 Change Optics Threshold Settings for STM-N Ports18-114 RefreshDLP-F395 Change the STM-N Port ALS Maintenance Settings Click the Maintenance ALS tabs18-115 18-116 DLP-F396 Clear All PM Thresholds18-117 DLP-F397 Provision the Designated Socks Servers18-118 18-119 18-120