Chapter 18 DLPs F300 to F399
DLP- F355 Roll Two
| Purpose | This task reroutes a network path using two optical circuits by allowing |
|
| CTC to select the Roll To path on the second circuit automatically. |
| Tools/Equipment | None |
| Prerequisite Procedures | |
| Required/As Needed | As needed |
| Onsite/Remote | Onsite or remote |
| Security Level | Provisioning and higher |
|
| |
Step 1 | From the View menu, choose Go To Network View. | |
Step 2 | Click the Circuits tab. |
|
Step 3 | Press Ctrl and click the two circuits that you want to use in the roll process. | |
| The Roll From path will be on one circuit and the Roll To path will be on the other circuit. The circuits | |
| must have a DISCOVERED status and must be the same size and direction for you to start a roll. The | |
| planned Roll To circuit must not carry traffic.The first Roll To path must be DCC connected to the source | |
| node of the Roll To circuit, and the second Roll To path must be DCC connected to the destination node | |
| of the Roll To circuit. |
|
Step 4 | From the Tools menu, choose Circuits > Roll Circuit. | |
Step 5 | In the Roll Attributes area, complete the following: |
a.From the Circuit Roll Mode
b.From the Circuit Roll Type
c.In the Roll From Circuit area, click the circuit that contains the Roll From path.
Step 6 Click Next.
Step 7 In the Pivot/Fixed Point 1 window, click the square representing the fixed path of the first
This path is a fixed point in the
Step 8 Click Next.
Step 9 Complete one of the following:
•If multiple Roll From paths exist, the Select Roll From dialog box appears. Select the path from which you want to roll traffic and click OK (Figure
•If multiple Roll From paths do not exist, continue with Step 10.
The circuit status for the Roll From path changes from DISCOVERED to ROLL PENDING.
Step 10 In the Pivot/Fixed Point 2 window, click the square that represents the fixed path of the second connection to be rolled.
The path that is not selected is the Roll From path. The Roll From path is deleted after the roll is completed. The path identifier appears in the text box below the graphic image.