Chapter 18 DLPs F300 to F399
DLP- F349 Install Fiber-Optic Cables for MS-SPRing Configurations
Table 18-3 | ONS 15600 SDH Circuit Status (continued) |
| | |
Status | | Definition/Activity |
| |
PENDING_MERGE | Any new circuits created to represent an alternate path in a |
| | topology upgrade are set to this status to indicate that it is a |
| | temporary circuit. These circuits can be deleted if a topology |
| | upgrade fails. For more information about topology |
| | upgrades, refer to the Cisco ONS 15600 SDH Reference |
| | Manual. |
| |
DROP_PENDING | A circuit is set to this status when a new circuit drop is being |
| | added. |
| | |
•Source—The circuit source in the format: node/slot/port/STS. If an ASAP PPM port is the circuit source, the port format is PIM-PPM-port, where PIM and PPM values are 1 through 4 (for example, p1-1-1). PPMs have only one port.
•Destination—The circuit destination in the format: node/slot/port/STS. If an ASAP PPM port is the circuit destination, the port format is PIM-PPM-port, where PIM and PPM values are 1 through 4 (for example, p1-1-1). PPMs have only one port.
•# of VLANS—(Future use) The number of VLANs used by an Ethernet circuit.
•# of Spans—The number of internode links that constitute the circuit. Right-clicking the column shows a shortcut menu from which you can choose Span Details to show or hide circuit span detail.
•State—The circuit service state, which is an aggregate of its cross-connects. The service states are Unlocked, Locked, or Locked-partial. For more information about circuit service states, refer to the “Administrative and Service States” appendix of the Cisco ONS 15600 SDH Reference Manual.
–Unlocked—All cross-connects are in service and operational.
–Locked—All cross-connects are Locked-enabled,maintenance or Locked-enabled,disabled.
–Locked-partial—At least one cross-connect is Unlocked-enabled and others are in the Locked-enabled,maintenance and/or Locked-enabled,disabled service states.
Step 3 Return to your originating procedure (NTP).
DLP-F349 Install Fiber-Optic Cables for MS-SPRing Configurations
Purpose | This task installs the fiber-optics to the east and west MS-SPRing ports at |
| each node. See Chapter 5, “Turn Up a Network” to provision and test |
| MS-SPRing configurations. |
Tools/Equipment | Fiber-optic cables |
Prerequisite Procedures | NTP-F119 Install the STM-N Cards, page 2-4 |
| NTP-F231 Clean Fiber Connectors and Adapters, page 14-16 |
Required/As Needed | As needed |
Onsite/Remote | Onsite |
Security Level | None |
| Cisco ONS 15600 SDH Procedure Guide, R8.0 |
18-54 | October 2007 |