3 – QCP2340/2342 Installation and Removal
Q
3.1.1
LEDs
The QCP2340/2342 LED1 and LED2 (QCP2342) function as shown in table
Table 3-1. LED1 and LED2 (QCP2342) Activity
Green LED | Amber LED | Activity |
|
|
|
On | On | Power |
On | Off | Online |
Off | On | Signal acquired |
Off | Flashing | Loss of synchronization |
Flashing | Flashing | Firmware error |
|
|
|
In a standard installation, LED3 is off, indicating that the HBA is active. In a hot swap installation, LED3 turns blue while the HBA is inserted. If the LED turns off, the HBA is inserted and has been configured.
3.1.2
Jumpers
Jumpers J4 (QCP2342) and J5 on the QCP2340/2322 HBA determine the default state of connectors J2 (QCP2342) and J1, respectively. The jumpers are set at the factory with a jumper plug on pins
CAUTION! Changing the jumper settings can result in the HBA being inoperable.
3.2
Installation and Removal
The following sections describe how to install the QCP2340/2342 HBA (standard and hot swap installations) as well as how to remove the HBA.
Before you install the QCP2340/2342 HBA in your computer, you need the following:
■A screwdriver (usually a Phillips #1)
■An optical, multimode cable with an
3.2.1
Installation in the Computer (Standard)
Perform the following steps to install the QCP2340/2342 HBA in your system. These instructions are for a standard installation (the computer is shut down). See section 3.2.2 for hot swap instructions.
1.Shut down the system.
2.Choose any available cPCI slot. (Check the indicator lights next to (or above) the available slots. The top two lights are off; the bottom light is amber.)