Planning Worksheet 2 of 5
> [electronic form] <
Account __________________________ Completed By ____________________ Date ___________
| Delivery and Handling Factors |
|
| Information to Note / Comments | ||
|
|
|
|
|
| |
2A. Does the customer have a delivery dock? If NO, where |
|
| ||||
2A. |
|
| ||||
| will the VTSS cabinet(s) be delivered? |
|
|
| ||
|
|
|
|
|
|
|
2B. Are there street or alley limitations that will hinder | 2B. |
| ||||
| ||||||
| delivery of the VTSS cabinet(s)? |
| ||||
|
|
|
| |||
|
|
|
| |||
2C. Is the delivery dock available only during specific | 2C. |
|
| |||
|
| |||||
| hours? If YES, what are the hours of availability? |
|
| |||
|
|
|
| |||
|
|
|
|
|
|
|
2D. Which specific persons (by name) will be used to move |
|
|
| |||
|
|
| ||||
| and position the VTSS cabinet(s)? Note: A packaged | 2D. |
| |||
| and |
| ||||
|
|
|
| |||
| (982 lbs.). |
|
|
| ||
2E. | Will a pallet jack or forklift with adjustable forks be avail- |
| ||||
2E. |
|
| ||||
| able for moving the VTSS cabinet(s)? |
|
|
| ||
|
|
|
|
|
|
|
2F. | Is there a freight or public elevator available for moving |
|
|
| ||
|
|
| ||||
| the VTSS cabinet(s) to the staging and installation ar- | 2F. |
|
| ||
| eas, or must stairs be used? |
|
|
| ||
2G. | Are there ramps along the path between the delivery |
|
|
| ||
|
|
| ||||
| dock and final installation area? If YES, have all ramp | 2G. |
| |||
| inclines been verified to be within specification to pre- |
| ||||
| vent tipping of the VTSS cabinet(s)? Note: Ramp |
|
|
| ||
|
|
|
|
|
|
|
| incline angles must NOT exceed 10 degrees. |
|
|
| ||
|
|
|
|
|
|
|
2H. Are floors along the transit path to the installation area | 2H. |
|
| |||
|
| |||||
| rated to support the VTSS cabinet(s)? |
|
| |||
|
|
|
| |||
|
|
|
|
|
|
|
Additional Information to Note / Comments (Specify By Above Item Number):
Sun Confidential: Internal Only