Site Evaluation – Internal Considerations
Site Power Distribution Systems
The following elements of the site power distribution system should be evaluated when planning an installation of VSM5 system equipment.
System Design
A properly installed power distribution system is required to ensure safe operation of VSM5 system equipment. Power should be supplied from a feeder separate from one used for lighting, air conditioning, and other electrical systems.
Atypical input power configuration, shown in Figure
Figure 4-1. Site Electrical Power Distribution System
Computer Room | Remotely Operated |
Power Panel | Power Service Disconnect |
Incoming
Ground Terminal Bar (bonded to enclosure) Same size as neutral
Neutral |
|
|
|
|
| Only valid at | ||||
|
|
|
|
|
|
|
|
|
| service entrance |
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
| or separately |
|
|
|
|
|
|
|
|
|
| derived system |
|
|
|
|
|
|
|
|
|
| (transformer) |
|
|
|
|
|
Ground
Service Entrance
Ground or Suitable
Building Ground
Note: Bounding of neutral and ground at other points is Illegal.
Ledgend:
Insulated Green Wire Ground
Phase Wires and Neutral
Neutral Bus
Circuit Breakers of
Appropriate Size
Branch Circuits
| *For loads requiring a |
| neutral attach computer/data |
| 120V * processing equipment only |
| Single |
208/240V Phase | |
208/240V | Single |
Phase | |
| |
208/240V | Customer Supplied |
Receptacles/Connectors- | |
in Accordance with |
Local Codes
A502_046
96257 | Sun Confidential: Internal Only | |
| Revision A |
|