![](/images/new-backgrounds/1192095/192095165x1.webp)
Operation
Table 7 | Alarms, functions, and corrective actions (continued) |
| ||||||
|
|
|
|
|
|
|
|
|
Actual |
|
|
|
|
|
|
|
|
Alarm/fault |
|
|
|
|
|
|
|
|
Name |
|
|
|
|
|
|
|
|
Displayed |
| Description | Fault |
|
|
|
|
|
On Front |
| of Alarm/ | Or | Latch | Dial | Freeze | Event Log |
|
Panel |
| Fault | Alarm | Mask | Mask | Mask | Mask | Meaning and Corrective Action(s) |
|
|
|
|
|
|
|
| On units equipped with an input filter, |
|
|
|
|
|
|
|
| Control Logic has determined that one or |
Trap Fuse |
|
|
|
|
|
|
| more of the filter fuses is open. The logic |
| Trap Fuse Fail | Fault | NO | YES | NO | YES | will open the Input filter contactor. The UPS | |
Fail |
| |||||||
|
|
|
|
|
|
| will continue to run, without input filtering. | |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| Contact Liebert Global Service to check |
|
|
|
|
|
|
|
| and repair the input filter. |
|
|
|
|
|
|
|
| Reports an On Battery state as long as the |
On Battery |
| On Battery | Alarm | NO | NO | NO | YES | battery CB is closed, Input Undervoltage |
| alarm exists, and the status bit ON UPS is | |||||||
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| set. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Battery charge current is 50% above the |
|
|
|
|
|
|
|
| Battery Charge Current Limit for longer than |
|
|
|
|
|
|
|
| 5 seconds. The load will be transferred to |
Battery |
| Battery |
|
|
|
|
| Bypass. If Bypass is not available the UPS |
| Fault | YES | YES | NO | YES | will attempt to run from the battery. If both | ||
Overcharge |
| Overchg | ||||||
|
|
|
|
|
| battery and bypass are not available, a full | ||
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| system shutdown will be initiated. This fault |
|
|
|
|
|
|
|
| will inhibit |
|
|
|
|
|
|
|
| Services immediately |
|
|
|
|
|
|
|
| The bypass frequency is outside the ± 5% |
|
|
|
|
|
|
|
| of the system rating. If the load is on |
|
|
|
|
|
|
|
| bypass the static switch will be shut down |
|
|
|
|
|
|
|
| and power will be lost to the load. If the load |
Byp Freq |
| Bypass |
|
|
|
|
| is on UPS, transfer to bypass will be |
| Frequency | Fault | NO | NO | NO | YES | inhibited, until this fault clears or is | |
Error |
| |||||||
| Error |
|
|
|
|
| corrected. This fault will inhibit startup. If | |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| fault persists check the bypass source for |
|
|
|
|
|
|
|
| the cause of the frequency irregularity. |
|
|
|
|
|
|
|
| Contact Liebert Global services if you have |
|
|
|
|
|
|
|
| questions. |
|
|
|
|
|
|
|
| With the load on Static Bypass the system |
|
|
|
|
|
|
|
| has determined that at least one phase of |
|
|
|
|
|
|
|
| the Bypass has exceeded the KVA, KW, or |
|
|
|
|
|
|
|
| RMS current vs. Time overload spec. The |
Byp ovld |
| Bypass |
|
|
|
|
| Static Bypass switch will be turned of and |
| OverLoad | Fault | YES | YES | NO | YES | the system will be shut down. Power to the | |
Shutdown |
| |||||||
| Shutdown |
|
|
|
|
| load will be turned off. Remove the excess | |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| load from the UPS and attempt to |
|
|
|
|
|
|
|
| the load is below the rating of the UPS and |
|
|
|
|
|
|
|
| it will not |
|
|
|
|
|
|
|
| Services. |
|
|
|
|
|
|
|
| The power conductors on the bypass line |
|
|
|
|
|
|
|
| are not wired to the UPS in the required |
|
|
|
|
|
|
|
| sequence. This alarm should appear only |
Byp Phase |
| Bypass Phase | Fault | NO | NO | NO | YES | during initial |
Rot Error |
| Rotation Error | source power system. Disconnect power | |||||
|
|
|
|
|
| |||
|
|
|
|
|
|
|
| from the bypass line and correct the wiring. |
|
|
|
|
|
|
|
| Liebert Global Services must be present |
|
|
|
|
|
|
|
| during initial |
|
|
|
|
|
|
|
| The system has detected a failed IGBT. |
IDC Peak |
| IDC Peak | Fault | YES | YES | NO | YES | The unit will transfer to Bypass if available. |
| Contact Liebert Global Services | |||||||
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| immediately. |
|
|
|
|
|
|
|
|
|
75