MGE UPS Systems 40-150kVA user manual This page left blank intentionally 86-160310-00 E00

Page 11

Installation and User Manual

(This page left blank intentionally)

86-160310-00 E00

c v

Image 11
Contents Comet 40-150kVA Page Revision History CometComet 40-150kVA Important Safety InstructionsSpecial Precautions Certification Standards Three Phase UPSSafety of Persons Product SafetyThis page left blank intentionally Contents Operation MaintenanceTables MGE Warranty & Proprietary Rights for Three Phase ProductsWarranty and Product Registration Customer Care Center Three Phase ProductsUPS Serial Number Battery Serial Number This page left blank intentionally 86-160310-00 E00 Section Descriptions Comet 40-150kVA Symbol UsageGeneral Description System Description and SpecificationsScope Single Line Diagram for the Comet 40-80kVA Major Components Detail Behind Item Rear View of the Comet 40-80kVA FU1-FU21 Control Fuses TOP Conduit Landing for Cable Access to Pcas Specifications DC Ratings Battery voltage 25 C PhasesWires Power factorAltitude Environmental Specifications Temperature6 DB15 Connector Pinouts and Designations HumidityOptions and Accessories Chaptername This page left blank intentionally For assistance InstallationReceiving HandlingEnvironmental Prerequisite to InstallationStorage May adversely affect lifeElectrical Short circuit when the unit is working on Static SwitchProper trip settings MechanicalConnections Installation ProceduresAC Output BatteryChaptername This page left blank intentionally Operation Power FlowPower Flow, For Normal Operation Power Flow, For On Battery OperationPower Flow, For Bypass Operation Graphical User Interface, Controls and IndicatorsComet Front Panel GUI, Controls and Indicators Fault Reset Emergency Power OffFault LED Battery Status LEDPreliminary Checks Startup ProceduresInverter Manual Startup Return to AC Power Operating ProceduresOperation on Battery Power Battery DurationOutput Current Overload Curve Forced Transfer Emergency Shutdown Using EPO/REPOMaintenance Bypass Move the fan control switch SR2 to the OFF position Inverter Shutdown Shutdown ProceduresAlarms Powering DownPreventive Maintenance MaintenanceBattery Safety Level Description Replacement PartsApplicable within the United States, Canada and Mexico Product Information Warranty Extension Warranty+User Information Return Policy for Repair of Three Phase Products RGA MGE Customer Care Center Three Phase ProductsTechnical Support and Product Services Scheduling Field Service Engineer SupportComet 40-150kVA Term used Definition / Meaning GlossaryFCC NEC This page left blank intentionally Reorder Form Scenic Avenue Costa Mesa, CA Page Page Contact MGE