MGE UPS Systems 40-150kVA user manual Single Line Diagram for the Comet 40-80kVA

Page 14

Comet 40-150kVA

Figure 1-3, and 1-4 show single-line diagrams of a typical UPS system installation. During normal operation, utility power (Main Input) is supplied to the UPS Rectifier where it is converted to DC voltage. The Inverter converts the DC voltage from the Rectifier to three-phase regulated AC voltage, which supplies the critical load. During power failure conditions, the Inverter is supplied by the stored energy in the batteries, and the load is powered continuously with no disruption.

Figure 1-3: Single Line Diagram for the Comet 40-80kVA.

UPS CABINET

BYPASS

AC INPUT (OPTIONAL)

MAIN AC INPUT

STATIC SWITCH

KA2

KA1

K3N

 

INPUT

OUTPUT

FUSES RECTIFIER

INVERTER FUSES

BATTERY

QF1

CABINET

SR1

TO

CRITICAL

LOAD

BATTERY

Figure 1-4: Single Line Diagram for the Comet 100-150kVA.

 

UPS CABINET

 

 

 

 

 

KA2

STATIC SWITCH

 

 

BYPASS

 

 

 

 

 

 

 

 

 

AC INPUT

 

 

 

 

SR1

 

 

 

 

 

MAIN

KA1

 

 

K3N

TO

 

 

 

 

 

 

 

CRITICAL

AC INPUT

 

 

 

 

INPUT

 

 

OUTPUT

LOAD

 

 

 

 

FUSES

RECTIFIER

INVERTER

FUSES

 

 

 

BATTERY

QF1

 

 

 

 

CABINET

 

 

 

 

 

 

 

 

 

BATTERY

 

 

1 — 2

System Description and Specifications

86-160310-00 E00

Image 14
Contents Comet 40-150kVA Page Comet Revision HistoryImportant Safety Instructions Comet 40-150kVAProduct Safety Certification Standards Three Phase UPSSafety of Persons Special PrecautionsThis page left blank intentionally Contents Maintenance OperationCustomer Care Center Three Phase Products MGE Warranty & Proprietary Rights for Three Phase ProductsWarranty and Product Registration TablesUPS Serial Number Battery Serial Number This page left blank intentionally 86-160310-00 E00 Comet 40-150kVA Symbol Usage Section DescriptionsGeneral Description System Description and SpecificationsScope Single Line Diagram for the Comet 40-80kVA Major Components Detail Behind Item Rear View of the Comet 40-80kVA FU1-FU21 Control Fuses TOP Conduit Landing for Cable Access to Pcas Specifications Power factor PhasesWires DC Ratings Battery voltage 25 CHumidity Environmental Specifications Temperature6 DB15 Connector Pinouts and Designations AltitudeOptions and Accessories Chaptername This page left blank intentionally Handling InstallationReceiving For assistanceMay adversely affect life Prerequisite to InstallationStorage EnvironmentalMechanical Short circuit when the unit is working on Static SwitchProper trip settings ElectricalInstallation Procedures ConnectionsBattery AC OutputChaptername This page left blank intentionally Power Flow, For On Battery Operation Power FlowPower Flow, For Normal Operation OperationGraphical User Interface, Controls and Indicators Power Flow, For Bypass OperationComet Front Panel GUI, Controls and Indicators Battery Status LED Emergency Power OffFault LED Fault ResetPreliminary Checks Startup ProceduresInverter Manual Startup Battery Duration Operating ProceduresOperation on Battery Power Return to AC PowerOutput Current Overload Curve Forced Transfer Emergency Shutdown Using EPO/REPOMaintenance Bypass Move the fan control switch SR2 to the OFF position Powering Down Shutdown ProceduresAlarms Inverter ShutdownPreventive Maintenance MaintenanceBattery Safety Replacement Parts Level DescriptionApplicable within the United States, Canada and Mexico Product Information Warranty Extension Warranty+User Information Scheduling Field Service Engineer Support MGE Customer Care Center Three Phase ProductsTechnical Support and Product Services Return Policy for Repair of Three Phase Products RGAComet 40-150kVA Glossary Term used Definition / MeaningFCC NEC This page left blank intentionally Reorder Form Scenic Avenue Costa Mesa, CA Page Page Contact MGE