3.9Shutdown Procedures

3.9.1Inverter Shutdown

Press and hold the gray "Inverter OFF" pushbutton for 3 seconds.

The green “Load Protected” LED goes off.

The red “Load Not Protected” LED goes on.

The buzzer sounds.

The Inverter stops if the transfer conditions are correct.

The load is transferred and supplied via the "Static Switch".

3.9.2Powering Down

It is recommended not to power down the Comet for long periods because the battery should remained charged. However, to carry out a power down, proceed as follows:

Shut down the Inverter.

Put the battery circuit breaker in the "OFF" position.

Put the upstream main circuit breaker in the "OFF" position.

All the indicating LED's on the control panel go off.

3.10Alarms

Any state other than normal operation (green “Load Protected” LED on) is considered a fault by the diagnostics system.

Before undertaking any servicing or other action, note the status of the different LED's and the GUI messages displayed on the panel.

If an alarm is present and the load still functions, it is supplied via the "Static Switch", i.e. it is not protected. Table 3-1: Alarm Indications.

beep beep

beep beep

beep beep

beep beep

status or action producing the indication

inverter start-up phase prior to load transfer. The "inverter on" button has been pressed.

normal operation;

load supplied by Comet UPS (SR1 in normal position)

inverter shutdown following pressing of the "inverter off" button or a major fault;

load supplied via the "static switch"

operation on battery power; load supplied by Comet UPS

end of battery power or battery should be checked

minor fault;

(load continues to be supplied via inverter)

UPS shutdown;

load supplied via maintenance bypass

Legend of alarm indications table:

buzzer off,

light off,

beep

 

beep

buzzer on,

 

 

light on,

 

light flashing

3 —10

Operation

86-160310-00 E00

Image 42
Contents Comet 40-150kVA Page Comet Revision HistoryImportant Safety Instructions Comet 40-150kVAProduct Safety Certification Standards Three Phase UPSSafety of Persons Special PrecautionsThis page left blank intentionally Contents Maintenance OperationCustomer Care Center Three Phase Products MGE Warranty & Proprietary Rights for Three Phase ProductsWarranty and Product Registration TablesUPS Serial Number Battery Serial Number This page left blank intentionally 86-160310-00 E00 Comet 40-150kVA Symbol Usage Section DescriptionsSystem Description and Specifications ScopeGeneral Description Single Line Diagram for the Comet 40-80kVA Major Components Detail Behind Item Rear View of the Comet 40-80kVA FU1-FU21 Control Fuses TOP Conduit Landing for Cable Access to Pcas Specifications Power factor PhasesWires DC Ratings Battery voltage 25 CHumidity Environmental Specifications Temperature6 DB15 Connector Pinouts and Designations AltitudeOptions and Accessories Chaptername This page left blank intentionally Handling InstallationReceiving For assistanceMay adversely affect life Prerequisite to InstallationStorage EnvironmentalMechanical Short circuit when the unit is working on Static SwitchProper trip settings ElectricalInstallation Procedures ConnectionsBattery AC OutputChaptername This page left blank intentionally Power Flow, For On Battery Operation Power FlowPower Flow, For Normal Operation OperationGraphical User Interface, Controls and Indicators Power Flow, For Bypass OperationComet Front Panel GUI, Controls and Indicators Battery Status LED Emergency Power OffFault LED Fault ResetStartup Procedures Inverter Manual StartupPreliminary Checks Battery Duration Operating ProceduresOperation on Battery Power Return to AC PowerOutput Current Overload Curve Emergency Shutdown Using EPO/REPO Maintenance BypassForced Transfer Move the fan control switch SR2 to the OFF position Powering Down Shutdown ProceduresAlarms Inverter ShutdownMaintenance Battery SafetyPreventive Maintenance Replacement Parts Level DescriptionApplicable within the United States, Canada and Mexico Warranty Extension Warranty+ User InformationProduct Information Scheduling Field Service Engineer Support MGE Customer Care Center Three Phase ProductsTechnical Support and Product Services Return Policy for Repair of Three Phase Products RGAComet 40-150kVA Glossary Term used Definition / MeaningFCC NEC This page left blank intentionally Reorder Form Scenic Avenue Costa Mesa, CA Page Page Contact MGE