3.3Startup Procedures

3.3.1Preliminary Checks

Check the settings of the protection devices.

Verify that the battery circuit breaker(s) are in the "OFF" position.

Verify that the Manual Bypass Switch SR1 is set to the “NORMAL” position.

Verify that the fan switch (SR2) is set to the “ON” position.

Check that the ventilation system is not blocked (air entry through the bottom front and exhaust through the top).

Check that there is a minimum of 36 inches clearance at the front and top for ventilation.

Check that the Comet no longer rests on its 4 wheels (lifting levelers in place).

Check that the load-circuit breaker(s) (where applicable) are in the "OFF" position.

3.3.2Powering Up the Comet

CAUTION

As soon as AC input power is supplied to the Comet (customer supplied up-

 

stream circuit breaker is in the “ON” position), the load is initially supplied

 

via the “Static Switch.” The Graphical User Interface (GUI) display will begin

 

to startup.

 

 

Apply AC input power to the unit by closing the upstream circuit breaker.

Put the battery circuit breaker(s) in the “ON” position.

The buzzer sounds.

The status LED's go on.

The rectifier starts up.

The cooling fans startup.

The inverter automatically starts up, except if the system is in “manual startup” mode (optional).

If the transfer conditions (AC input power within tolerances) are correct, the Inverter comes on line and supplies the load. The green "Load Protected" LED goes on.

3.4Inverter Manual Startup

Typically, the Inverter is configured for automatic startup mode. For manual startup mode configuration, contact MGE Customer Support Services.

For manual startup:

Press the green "Inverter ON" pushbutton.

The green "Load Protected" LED flashes.

The Inverter starts and if the transfer conditions are correct, the load is transferred to the Inverter.

The red "Load Not Protected" LED goes off.

The green "Load Protected" LED goes on.

The GUI display indicates Load Protected.

86-160310-00 E00

Operation

3 —5

Image 37
Contents Comet 40-150kVA Page Revision History CometComet 40-150kVA Important Safety InstructionsSafety of Persons Certification Standards Three Phase UPSProduct Safety Special PrecautionsThis page left blank intentionally Contents Operation MaintenanceWarranty and Product Registration MGE Warranty & Proprietary Rights for Three Phase ProductsCustomer Care Center Three Phase Products TablesUPS Serial Number Battery Serial Number This page left blank intentionally 86-160310-00 E00 Section Descriptions Comet 40-150kVA Symbol UsageScope System Description and SpecificationsGeneral Description Single Line Diagram for the Comet 40-80kVA Major Components Detail Behind Item Rear View of the Comet 40-80kVA FU1-FU21 Control Fuses TOP Conduit Landing for Cable Access to Pcas Specifications Wires PhasesPower factor DC Ratings Battery voltage 25 C6 DB15 Connector Pinouts and Designations Environmental Specifications TemperatureHumidity AltitudeOptions and Accessories Chaptername This page left blank intentionally Receiving InstallationHandling For assistanceStorage Prerequisite to InstallationMay adversely affect life EnvironmentalProper trip settings Short circuit when the unit is working on Static SwitchMechanical ElectricalConnections Installation ProceduresAC Output BatteryChaptername This page left blank intentionally Power Flow, For Normal Operation Power FlowPower Flow, For On Battery Operation OperationPower Flow, For Bypass Operation Graphical User Interface, Controls and IndicatorsComet Front Panel GUI, Controls and Indicators Fault LED Emergency Power OffBattery Status LED Fault ResetInverter Manual Startup Startup ProceduresPreliminary Checks Operation on Battery Power Operating ProceduresBattery Duration Return to AC PowerOutput Current Overload Curve Maintenance Bypass Emergency Shutdown Using EPO/REPOForced Transfer Move the fan control switch SR2 to the OFF position Alarms Shutdown ProceduresPowering Down Inverter ShutdownBattery Safety MaintenancePreventive Maintenance Level Description Replacement PartsApplicable within the United States, Canada and Mexico User Information Warranty Extension Warranty+Product Information Technical Support and Product Services MGE Customer Care Center Three Phase ProductsScheduling Field Service Engineer Support Return Policy for Repair of Three Phase Products RGAComet 40-150kVA Term used Definition / Meaning GlossaryFCC NEC This page left blank intentionally Reorder Form Scenic Avenue Costa Mesa, CA Page Page Contact MGE