MGE UPS Systems 40-150kVA Emergency Shutdown Using EPO/REPO, Forced Transfer, Maintenance Bypass

Page 40

Comet 40-150kVA

3.6Emergency Shutdown Using EPO/REPO

CAUTION

Pressing the “Emergency Power Off” (EPO) or “Remote Emergency Power Off”

 

(REPO) pushbutton disconnects the attached load. The EPO is to be used during

 

emergency situations only, where a hazard to personnel or equipment exists, such

 

as during a fire. DO NOT USE THE EPO TO TURN THE UPS ON OR OFF.

 

Follow the procedures listed in this section for turning the Inverter on and off.

During an emergency situation, such as a fire in the computer or electrical room, the UPS and all downstream devices can be instantly shut down by pressing the EPO pushbutton on the front panel of the UPS cabinet, or by pressing the "Remote Emergency Power Off" (REPO) optional pushbutton.

The EPO or REPO pushbuttons should not be used for normal shutdown of the equipment.

If the EPO pushbutton has been pressed, it must be reset by pressing it again and by pressing the "Fault Reset" key on the front panel to allow the UPS to restart.

3.7Forced Transfer

CAUTION

Using the forced transfer functions will cause the load to experience a power

 

interruption for a minimum of 500 milliseconds. Be certain that the load can

 

tolerate this interruption.

 

Forced transfer is required if bypass input is out of tolerance. The load can be transferred from the Inverter output to the bypass input source, or back, with a power interruption of 500 milliseconds.

Transferring the Load to Bypass Input From Inverter

On the front panel, press the "Security" key and hold it while pressing the gray "Inverter OFF" pushbutton for 3 seconds.

Transferring the Load to Inverter From Bypass Input

On the front panel, press the "Security" key and hold it while pressing the green "Inverter ON" pushbutton for 3 seconds.

3.8Maintenance Bypass

This procedure assumes that the UPS is operating normally, with the attached load supplied via the Inverter.

3.8.1From Normal Maintenance Bypass Mode

1.Stop the Inverter by pressing the gray "Inverter OFF" pushbutton on the UPS front panel for approximately three

(3) seconds. The audible alarm will sound; silence the alarm by pressing the "Buzzer Reset" pushbutton. If the transfer conditions are not satisfied (bypass out of tolerance or other reason), a forced transfer will be required. Refer to the "Forced Transfers" section for more information.

2.Switch the battery circuit breaker QF1 to the "OFF" position.

NOTE

The battery circuit breaker QF1 will automatically trip open if left in the “ON”

 

position when the UPS is placed in the Maintenance Bypass mode.

 

 

3.Turn the manual bypass switch to the "TRANSFER" position, then to the "BYPASS" position.

4.All indicating LED's go off.

3 —8

Operation

86-160310-00 E00

Image 40
Contents Comet 40-150kVA Page Comet Revision HistoryImportant Safety Instructions Comet 40-150kVACertification Standards Three Phase UPS Safety of PersonsProduct Safety Special PrecautionsThis page left blank intentionally Contents Maintenance OperationMGE Warranty & Proprietary Rights for Three Phase Products Warranty and Product RegistrationCustomer Care Center Three Phase Products TablesUPS Serial Number Battery Serial Number This page left blank intentionally 86-160310-00 E00 Comet 40-150kVA Symbol Usage Section DescriptionsScope System Description and SpecificationsGeneral Description Single Line Diagram for the Comet 40-80kVA Major Components Detail Behind Item Rear View of the Comet 40-80kVA FU1-FU21 Control Fuses TOP Conduit Landing for Cable Access to Pcas Specifications Phases WiresPower factor DC Ratings Battery voltage 25 CEnvironmental Specifications Temperature 6 DB15 Connector Pinouts and DesignationsHumidity AltitudeOptions and Accessories Chaptername This page left blank intentionally Installation ReceivingHandling For assistancePrerequisite to Installation StorageMay adversely affect life EnvironmentalShort circuit when the unit is working on Static Switch Proper trip settingsMechanical ElectricalInstallation Procedures ConnectionsBattery AC OutputChaptername This page left blank intentionally Power Flow Power Flow, For Normal OperationPower Flow, For On Battery Operation OperationGraphical User Interface, Controls and Indicators Power Flow, For Bypass OperationComet Front Panel GUI, Controls and Indicators Emergency Power Off Fault LEDBattery Status LED Fault ResetInverter Manual Startup Startup ProceduresPreliminary Checks Operating Procedures Operation on Battery PowerBattery Duration Return to AC PowerOutput Current Overload Curve Maintenance Bypass Emergency Shutdown Using EPO/REPOForced Transfer Move the fan control switch SR2 to the OFF position Shutdown Procedures AlarmsPowering Down Inverter ShutdownBattery Safety MaintenancePreventive Maintenance Replacement Parts Level DescriptionApplicable within the United States, Canada and Mexico User Information Warranty Extension Warranty+Product Information MGE Customer Care Center Three Phase Products Technical Support and Product ServicesScheduling Field Service Engineer Support Return Policy for Repair of Three Phase Products RGAComet 40-150kVA Glossary Term used Definition / MeaningFCC NEC This page left blank intentionally Reorder Form Scenic Avenue Costa Mesa, CA Page Page Contact MGE