MGE UPS Systems 40-150kVA user manual Detail Behind Item

Page 16

Comet 40-150kVA

Figure 1-5: Front View of the Comet 40-80kVA.

DETAIL BEHIND ITEM 25

A

01

04

05

02

1(KA1) Input Contactor

2(K3N) Output Contactor

3(KA2) Bypass Input Contactor (Optional)

4(F1, F2, F3) Input Fuses

5(F4, F5, F6) Output Fuses

6(SR1) Rotary Switch

7Rectifier/Static Switch Assembly

8Inverter Assembly

9Feedback PCA

10DC Power Supply PCA

11Interconnect PCA

12High-Frequency Power Supply PCA

13(FU1-FU6) Power Supply Fuses

14Teleservice Receptacles (J1-J2) & Fuse (FU13)

15Heatsink Cooling Fans

16(TB3) Separate Bypass Input Terminal Block

17Battery Connections

18(TB1) Main Input Terminal Block

19(TB2) Output Terminal Block

20(SR2) Fan Control Switch

21(FU7-FU12) Fan and Teleservice Fuses

22Ground Busbar

23Neutral Busbar

24Bottom of Top-Entry Channel

25Battery Charger

1 — 4

System Description and Specifications

86-160310-00 E00

Image 16
Contents Comet 40-150kVA Page Comet Revision HistoryImportant Safety Instructions Comet 40-150kVACertification Standards Three Phase UPS Safety of PersonsProduct Safety Special PrecautionsThis page left blank intentionally Contents Maintenance OperationMGE Warranty & Proprietary Rights for Three Phase Products Warranty and Product RegistrationCustomer Care Center Three Phase Products TablesUPS Serial Number Battery Serial Number This page left blank intentionally 86-160310-00 E00 Comet 40-150kVA Symbol Usage Section DescriptionsScope System Description and SpecificationsGeneral Description Single Line Diagram for the Comet 40-80kVA Major Components Detail Behind Item Rear View of the Comet 40-80kVA FU1-FU21 Control Fuses TOP Conduit Landing for Cable Access to Pcas Specifications Phases WiresPower factor DC Ratings Battery voltage 25 CEnvironmental Specifications Temperature 6 DB15 Connector Pinouts and DesignationsHumidity AltitudeOptions and Accessories Chaptername This page left blank intentionally Installation ReceivingHandling For assistancePrerequisite to Installation StorageMay adversely affect life EnvironmentalShort circuit when the unit is working on Static Switch Proper trip settingsMechanical ElectricalInstallation Procedures ConnectionsBattery AC OutputChaptername This page left blank intentionally Power Flow Power Flow, For Normal OperationPower Flow, For On Battery Operation OperationGraphical User Interface, Controls and Indicators Power Flow, For Bypass OperationComet Front Panel GUI, Controls and Indicators Emergency Power Off Fault LEDBattery Status LED Fault ResetInverter Manual Startup Startup ProceduresPreliminary Checks Operating Procedures Operation on Battery PowerBattery Duration Return to AC PowerOutput Current Overload Curve Maintenance Bypass Emergency Shutdown Using EPO/REPOForced Transfer Move the fan control switch SR2 to the OFF position Shutdown Procedures AlarmsPowering Down Inverter ShutdownBattery Safety MaintenancePreventive Maintenance Replacement Parts Level DescriptionApplicable within the United States, Canada and Mexico User Information Warranty Extension Warranty+Product Information MGE Customer Care Center Three Phase Products Technical Support and Product ServicesScheduling Field Service Engineer Support Return Policy for Repair of Three Phase Products RGAComet 40-150kVA Glossary Term used Definition / MeaningFCC NEC This page left blank intentionally Reorder Form Scenic Avenue Costa Mesa, CA Page Page Contact MGE