MGE UPS Systems 40-150kVA user manual Rear View of the Comet 40-80kVA

Page 17

Installation and User Manual

Figure 1-6: Rear View of the Comet 40-80kVA.

TOP ENTRY

CONDUIT LANDING

TOP ENTRY

CHANNEL

T1 INPUT TRANSFORMER (OPTIONAL)

T2 OUTPUT TRANSFORMER (OPTIONAL)

86-160310-00 E00

System Description and Specifications

1 — 5

Image 17
Contents Comet 40-150kVA Page Revision History CometComet 40-150kVA Important Safety InstructionsSafety of Persons Certification Standards Three Phase UPSProduct Safety Special PrecautionsThis page left blank intentionally Contents Operation MaintenanceWarranty and Product Registration MGE Warranty & Proprietary Rights for Three Phase ProductsCustomer Care Center Three Phase Products TablesUPS Serial Number Battery Serial Number This page left blank intentionally 86-160310-00 E00 Section Descriptions Comet 40-150kVA Symbol UsageGeneral Description System Description and SpecificationsScope Single Line Diagram for the Comet 40-80kVA Major Components Detail Behind Item Rear View of the Comet 40-80kVA FU1-FU21 Control Fuses TOP Conduit Landing for Cable Access to Pcas Specifications Wires PhasesPower factor DC Ratings Battery voltage 25 C6 DB15 Connector Pinouts and Designations Environmental Specifications TemperatureHumidity AltitudeOptions and Accessories Chaptername This page left blank intentionally Receiving InstallationHandling For assistanceStorage Prerequisite to InstallationMay adversely affect life EnvironmentalProper trip settings Short circuit when the unit is working on Static SwitchMechanical ElectricalConnections Installation ProceduresAC Output BatteryChaptername This page left blank intentionally Power Flow, For Normal Operation Power FlowPower Flow, For On Battery Operation OperationPower Flow, For Bypass Operation Graphical User Interface, Controls and IndicatorsComet Front Panel GUI, Controls and Indicators Fault LED Emergency Power OffBattery Status LED Fault ResetPreliminary Checks Startup ProceduresInverter Manual Startup Operation on Battery Power Operating ProceduresBattery Duration Return to AC PowerOutput Current Overload Curve Forced Transfer Emergency Shutdown Using EPO/REPOMaintenance Bypass Move the fan control switch SR2 to the OFF position Alarms Shutdown ProceduresPowering Down Inverter ShutdownPreventive Maintenance MaintenanceBattery Safety Level Description Replacement PartsApplicable within the United States, Canada and Mexico Product Information Warranty Extension Warranty+User Information Technical Support and Product Services MGE Customer Care Center Three Phase ProductsScheduling Field Service Engineer Support Return Policy for Repair of Three Phase Products RGAComet 40-150kVA Term used Definition / Meaning GlossaryFCC NEC This page left blank intentionally Reorder Form Scenic Avenue Costa Mesa, CA Page Page Contact MGE