MGE UPS Systems 40-150kVA user manual Operation, Maintenance

Page 8

Comet 40-150kVA

 

section

description

. .page

Section 2

Installation (continued)

 

 

2.6

Connections

.2 — 4

 

2.6.1

Main AC Input

.2 — 4

 

2.6.2

Bypass AC Input (Optional)

.2 — 4

 

2.6.3

Remote Emergency Power Off (REPO)

.2 — 4

 

2.6.4

AC Output

.2 — 5

 

2.6.5

Battery

.2 — 5

Section 3

Operation

 

 

 

3.0

Scope

.3 — 1

 

3.1

Power Flow

.3 — 1

 

3.1.1

Power Flow, For Normal Operation

.3 — 1

 

3.1.2

Power Flow, For On Battery Operation

.3 — 1

 

3.1.3

Power Flow, For Bypass Operation

.3 — 2

 

3.2

Graphical User Interface, Controls and Indicators

.3 — 2

 

3.3

Startup Procedures

.3 — 5

 

3.3.1

Preliminary Checks

.3 — 5

 

3.3.2

Powering Up the Comet

.3 — 5

 

3.4

Inverter Manual Startup

.3 — 5

 

3.5

Operating Procedures

.3 — 6

 

3.5.1

Normal Operation

.3 — 6

 

3.5.2

Operation on Battery Power

.3 — 6

 

3.5.3

Battery Duration

.3 — 6

 

 

3.5.3.1 Return to AC Power

.3 — 6

 

3.5.4

Overload

.3 — 7

 

3.6

Emergency Shutdown Using EPO/REPO

.3 — 8

 

3.7

Forced Transfer

.3 — 8

 

3.8

Maintenance Bypass

.3 — 8

 

3.8.1

From Normal Maintenance Bypass Mode

.3 — 8

 

3.8.2

From Maintenance Bypass to Normal Mode

.3 — 9

 

3.9

Shutdown Procedures

3 — 10

 

3.9.1

Inverter Shutdown

3 — 10

 

3.9.2

Powering Down

3 — 10

 

3.10

Alarms

3 — 10

Section 4

Maintenance

 

 

4.0

Scope

.4 — 1

 

4.1

Battery Safety

.4 — 1

 

4.2

Preventive Maintenance

.4 — 1

 

4.3

Replacement Parts

.4 — 2

c ii

Contents

86-160310-00 E00

Image 8
Contents Comet 40-150kVA Page Comet Revision HistoryImportant Safety Instructions Comet 40-150kVACertification Standards Three Phase UPS Safety of PersonsProduct Safety Special PrecautionsThis page left blank intentionally Contents Maintenance OperationMGE Warranty & Proprietary Rights for Three Phase Products Warranty and Product RegistrationCustomer Care Center Three Phase Products TablesUPS Serial Number Battery Serial Number This page left blank intentionally 86-160310-00 E00 Comet 40-150kVA Symbol Usage Section DescriptionsGeneral Description System Description and SpecificationsScope Single Line Diagram for the Comet 40-80kVA Major Components Detail Behind Item Rear View of the Comet 40-80kVA FU1-FU21 Control Fuses TOP Conduit Landing for Cable Access to Pcas Specifications Phases WiresPower factor DC Ratings Battery voltage 25 CEnvironmental Specifications Temperature 6 DB15 Connector Pinouts and DesignationsHumidity AltitudeOptions and Accessories Chaptername This page left blank intentionally Installation ReceivingHandling For assistancePrerequisite to Installation StorageMay adversely affect life EnvironmentalShort circuit when the unit is working on Static Switch Proper trip settingsMechanical ElectricalInstallation Procedures ConnectionsBattery AC OutputChaptername This page left blank intentionally Power Flow Power Flow, For Normal OperationPower Flow, For On Battery Operation OperationGraphical User Interface, Controls and Indicators Power Flow, For Bypass OperationComet Front Panel GUI, Controls and Indicators Emergency Power Off Fault LEDBattery Status LED Fault ResetPreliminary Checks Startup ProceduresInverter Manual Startup Operating Procedures Operation on Battery PowerBattery Duration Return to AC PowerOutput Current Overload Curve Forced Transfer Emergency Shutdown Using EPO/REPOMaintenance Bypass Move the fan control switch SR2 to the OFF position Shutdown Procedures AlarmsPowering Down Inverter ShutdownPreventive Maintenance MaintenanceBattery Safety Replacement Parts Level DescriptionApplicable within the United States, Canada and Mexico Product Information Warranty Extension Warranty+User Information MGE Customer Care Center Three Phase Products Technical Support and Product ServicesScheduling Field Service Engineer Support Return Policy for Repair of Three Phase Products RGAComet 40-150kVA Glossary Term used Definition / MeaningFCC NEC This page left blank intentionally Reorder Form Scenic Avenue Costa Mesa, CA Page Page Contact MGE