![](/images/new-backgrounds/1203635/20363539x1.webp)
Start-up
System start-up
Single-unit or modular UPS
Proceed in the following order:
◗close the upstream switches supplying Mains 1 and 2 power (on the LV switchboard);
◗close Mains 1 input switch Q1.
The system powers up:
Q1 Q4S Q3BP Q5N
OFF | ON | OFF | ON | OFF |
(0) | (I) | (0) | (I) | (0) |
|
|
|
◗red "load not protected" light 2 on the control panel goes on,
◗the rectifier/chargers automatically starts;
◗close Mains 2 input Q4S:
Q1 Q4S Q3BP Q5N
ON | OFF | ON | ON | OFF |
|
| |||
(I) | (0) | (I) | (I) | (0) |
|
|
|
◗close inverter output switch Q5N:
Q1 Q4S Q3BP Q5N
ON | ON | ON | OFF | ON |
(I) | (I) | (I) | (0) | (I) |
|
|
|
◗close battery circuit breaker QF1:
QF1 | |
OFF | ON |
(0) | (I) |
◗open maintenance bypass switch Q3BP:
Q1 Q4S Q3BP Q5N
ON | ON | ON OFF | ON | |
(I) | (I) | (I) | (0) | (I) |
|
|
|
◗press the inverter on button 6 on the control panel:
! | ! | + – | I | O |
| ||||
|
|
| 6 |
|
◗green "load protected" light 5 blinks for 3 seconds,
◗the inverter starts and if transfer to
Mains 2 conditions are correct, the load is supplied by the inverter,
◗red "load not protected" light 2 goes off,
◗green "load protected" light 5 remains on, without blinking.
Multi-bypass modular UPS
Proceed in the following order:
◗check that switches Q1, Q4S, Q5N and QF1 on the UPSs are open and that switches Q3BP are closed, otherwise set them to the required position;
◗close the upstream switches (on the
◗close the Mains 1 input switch Q1 on the UPSs to supply them with power:
Q1 Q4S Q3BP Q5N
OFF | ON | OFF | ON | OFF |
(0) | (I) | (0) | (I) | (0) |
|
|
|
◗red "load not protected" light 2 on the control panels of the UPSs goes on:
! | ! | + – | I | O |
|
|
|
|
2
◗the rectifier/chargers automatically start;
◗close the Mains 2 input switch Q4S on the UPSs:
Q1 Q4S Q3BP Q5N
ON | OFF | ON | ON | OFF |
(I) | (0) | (I) | (I) | (0) |
|
|
|
◗close inverter output switch Q5N on the UPSs:
Q1 | Q4S | Q3BP | Q5N | |
ON | ON | ON | OFF | ON |
(I) | (I) | (I) | (0) | (I) |
|
|
|
◗close battery circuit breaker QF1 on the UPSs:
QF1
OFF | ON |
(0) | (I) |
◗open maintenance bypass switch Q3BP on the UPSs:
Q1 Q4S Q3BP Q5N
ON | ON | ON OFF | ON | |
(I) | (I) | (I) | (0) | (I) |
|
|
|
◗the load is now supplied by the Mains 2 input via the static switches of the UPSs.
◗press the "inverter on" button 6 on the control panel of each UPSs:
! | ! | + – | I | O |
| ||||
|
|
| 6 |
|
◗green "load protected" light 5 flashes for three seconds,
◗the inverter starts and, if transfer conditions with the Mains 2 input are correct, the load is transferred to the inverter,
◗red "load not protected" light 2 goes off,
◗green "load protected" light 5 on the control panel goes on.