APC 6739380EN/JC Voltage measurements, Current measurements, Display of voltage measurements

Page 42

"Monitor" alphanumeric display (cont.)

Voltage measurements

These measurements may be accessed in two manners:

Display of voltage measurements

pressing the "V" button displays the series of screens in the figure opposite;

in "Monitor" multi-cubicle mode, pressing the ">" button when the screen already displays the voltage measurements of a cubicle.

The system shifts to the voltage measurements of the next cubicle.

Note:

Mains 2 measurements are not

displayed on converters and parallel UPS with SSC;

Mains 1 and inverter output measurements are not displayed on Static Switch Cubicles.

Caution:

For installations comprising a number of modular UPSs connected in parallel, the absence of load (UPS output) voltage indicated on a display is only valid if it also indicated on the displays of all the other parallel-connected UPSs. Before carrying out any work on a UPS, always check the absence of voltage using a method complying with applicable safety rules for work on electrical equipment.

V

MNS.1

 

U12

 

U23

U31

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MNS.2

 

V1

V2

V3

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MNS.2

 

U12

 

U23

U31

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INV.

 

V1

V2

V3

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INV.

 

U12

 

U23

U31

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOAD

 

V1

V2

V3

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOAD

 

U12

 

U23

U31

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Direct access to the function by pressing the "V" button.

Mains 1 input phase-to-phase voltages in V rms (RC input).

Mains 2 input phase-to-neutral voltage in V rms.

Mains 2 input phase-to-phase voltages in V rms.

Inverter output phase-to-neutral voltage in V rms.

Inverter output phase-to-phase voltages in V rms.

Load phase-to-neutral voltage in V rms.

Load phase-to-phase voltages in V rms.

V

Current measurements

These measurements may be accessed in two manners:

Display of current measurements

pressing the "A" button displays the series of screens in the figure opposite;

in "Monitor" multi-cubicle mode, pressing the ">" button when the screen already displays the current measurements of a cubicle.

The system shifts to the current measurements of the next cubicle.

Note:

Mains 2 measurements are not displayed on UPS cubicles in parallel UPS systems;

Mains 1 and inverter output measurements are not displayed on Static Switch Cubicles.

A

MNS.1

 

 

I1

I2

 

 

I3

A RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MNS.2

 

 

I1

I2

 

 

I3

A RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INV.

 

 

I1

I2

 

 

I3

A RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOAD

 

 

I1

I2

 

 

 

I3

A RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I LOAD

/ IN

 

 

 

 

 

 

 

 

 

 

=

 

 

%

 

 

(IN =

 

 

 

 

A)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOAD

 

 

I1

I2

 

 

 

I3

PEAK F.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Direct access to the function by pressing the "A" button.

Currents of the three phases at Mains 1 input in A rms (RC input).

Currents of the three phases at Mains 2 input in A rms.

Currents of the three phases at inverter output input in A rms.

Currents of the three load phases in A rms.

Percentage of the current drawn on the most heavily loaded load phase with regards to the rated current (in parentheses).

Peak factor for each phase of the load current with regards to a sine current.

A

Page 42 - 6739380EN/JC

Image 42
Contents Mgetm GalaxyTM 2 6739380EN/JC Contents Options System description IntroductionSystem performance System may also includeDifferent types of MGETMGalaxyTM 6000 systems Up to 4 UPS identical ratings can be parallel-connectedFrequency converter with battery backup power figure Static Switch Cubicle Isolation and protection devicesUPS or converter cubicles Main operating modes Normal operationOperation with Mains 1 down Battery time Operation with Mains 1 restoredBattery charge cycle Installation with an engine generator set Example of an installation with an engine generator setUPS shutdown or overload Frequency converters with redundancy Output voltage quality and continuityFrequency converters without redundancy Overload curve250 to 400kVA UPS or frequency converter Description of MGETMGalaxyTM 6000 cubiclesInverter cubicle 450 to 500kVA UPS or frequency converterBattery cubicle KVA UPSFor a 250 to 300kVA UPS Static Switch Cubicle External maintenance bypass cubicleVisible control panel Visible control panel Static Switch CubicleControl panel Mgetm GalaxyTM 6000 control panelLoad not protected light Buzzer Operating problem lightBattery operation light Load protected lightHidden control panel Light H inverter fault Light F battery temperature outside tolerancesLight G battery charging Light I battery dischargedSingle-unit or modular UPS Start-upSystem start-up Multi-bypass modular UPSModular UPS with external maintenance bypass Galaxy UPSFrequency converters Parallel UPS systems with a Static Switch CubicleStart-up of a unit Start-up of a rectifier/chargerSingle-unit or modular UPS system Frequency converter without a batteryStart-up of an inverter Frequency converter or multi-bypass UPSShutdown of an inverter ShutdownShutdown of a unit Shutdown of an rectifier/chargerSingle-unit or single modular External maintenance bypassSystem shutdown Modular UPSNo Mains Buzzer resetParallel UPSs with SSC With MainsAlarms Maintenance bypassEnvironment information Signal receptionSignal transmission Standard information Media ContactsLED signalling box optional Additional information Media Contacts 15 optionalAdditional remote transmission board 30 6739380EN/JC Maintenance Maintenance configurationSingle-unit or single modular UPS figure Frequency converter or parallel UPS with SSC Isolate the UPSsBattery maintenance Vented lead-acid batteriesAutodiagnostics Visual checkFunctional check Training centers Monitor alphanumeric display GeneralDisplay Lights 1 to Green lightsRed lights Alarm display and buzzer reset List of general alarmsDisplay of alarms List of secondary alarms Mains 2 Problem Check FrequencyBattery is currently being recharged Measurement system Display of voltage measurements Voltage measurementsCurrent measurements Display of current measurementsDisplay of power and frequency measurements Frequency and power measurementsBattery measurements Display of battery measurementsBattery test see figure opposite Display for the inverter On/Off commands Inverter On/Off commandsLanguage, display contrast and buzzer volume settings Display of the settings selection screensDisplay system configuration Display system configurationMedia Contacts 15 additional auxiliary transmission LED signalling boxOptions Tele-Monitor remote indications unitHarmonics filter and power factor improvement Vision displayRemote vision display Empty cubicles Battery Temperature MonitorDouble bridge rectifier-charger Mgetm GalaxyTM 6000UPSs standard input rectifier-charger50 6739380EN/JC