Toshiba G8000 Series installation manual Transportation by a forklift

Page 23

8.2 Transportation by a forklift

Space for the forks is provided underneath the UPS. Insert the forks into the space shown in Figure 8.6.

Make sure forklift’s maximum load is enough to carry UPS. Refer to chapter 7 “Dimension and Weight” for UPS weight.

< 100~225kVA >

Base

Fix the forks up against the base

Insert the forks here

< 250/300kVA >

(If possible)

Figure 8.6 -

Transportation by a forklift

Insert the forks here

Ensure that the UPS does not swing or tilt. Then lift and transport the UPS Minimize the impact of a sudden stop when lowering the UPS to a resting surface.

22

Image 23
Contents Document Number February Introduction Uninterruptible Power Supply Contacting Toshiba’s Customer Support Center Manual’s Purpose and ScopeGeneral Safety Instructions Important Safety Instructions Safety Precautions Prohibited General Terms Do not remove the rear/side panelsAvoid vibration or shock exceeding 0.5G to the UPS Installation PrecautionsUPS Installation Environment Standard Keep the specified clearance around the UPS Keep the UPS room cleanDo not install the UPS close to a water source Mandatory Connect ground wire to the earth ground terminal onlyLocations of the Warning Labels 100/125 kVA Locations of the Warning Labels 150/180/225 kVA AC Input Grounding Electrode Terminal Contents 100/125kVA UPS Exterior dimensions front & right side Dimensions and Weight150/180/225kVA UPS Exterior dimensions front & right side 250/300kVA UPS Exterior dimensions front & right side Transportation by a crane TransportationAvoid vibration or shock exceeding 0.5 G to the UPS Do not expose the UPS to waterAngle more than Transportation by a forklift Storage Ensure that there is adequate working space around InstallationUPS Clearance UnpackingPoints to be observed Anchor bolt tightening Anchor boltsOverview External Wiring DiagramPhase 3-wire Phase 4-wire Terminal Blocks and Power CablesRecommended Cable Size and Tightening Torque for 125kVA UPS Recommended Cable Size and Tightening Torque for 180kVA UPS Phase 3-wire Phase 4-wire Recommended Cable Size and Tightening Torque for 250kVA UPS Ilsco External Breaker Rating External Breakers100~225kVA 250/300kVA Grounding Wire10 External Connections Control WiresRecommended configuration with input neutral grounded Grounding configurationRecommended configuration with delta-input Grounding configuration without input neutral12 Grounding configuration with corner-grounded delta-input Grounding configuration with corner-grounded delta-input
Related manuals