10. Installation

WARNING

When transporting the UPS, do not tilt the UPS more than 10° from

upright.

Titling the UPS more than 10° may cause personal injury in the event

that it falls or is overturned.

Do not transport, move, store, or place the UPS on its side.

Excessive force applied from heavy objects placed inside of the cabinet

may damage the UPS.

When unpacking the UPS do not give a direct shock or impact to

the UPS using a hammer or disassembling tool.

It may damage the UPS.

Tighten anchor bolts to secure the UPS to the installation floor.

The UPS may fall during an earthquake if the anchor bolts are not

installed and secured.

Ensure that there is adequate working space around the

unpacking/installation area.

24

Image 25
Contents Document Number February Introduction Uninterruptible Power Supply Contacting Toshiba’s Customer Support Center Manual’s Purpose and ScopeGeneral Safety Instructions Important Safety Instructions Safety Precautions Prohibited General Terms Do not remove the rear/side panelsAvoid vibration or shock exceeding 0.5G to the UPS Installation PrecautionsUPS Installation Environment Standard Do not install the UPS close to a water source Keep the UPS room cleanKeep the specified clearance around the UPS Mandatory Connect ground wire to the earth ground terminal onlyLocations of the Warning Labels 100/125 kVA Locations of the Warning Labels 150/180/225 kVA AC Input Grounding Electrode Terminal Contents 100/125kVA UPS Exterior dimensions front & right side Dimensions and Weight150/180/225kVA UPS Exterior dimensions front & right side 250/300kVA UPS Exterior dimensions front & right side Avoid vibration or shock exceeding 0.5 G to the UPS TransportationDo not expose the UPS to water Transportation by a craneAngle more than Transportation by a forklift Storage Ensure that there is adequate working space around InstallationPoints to be observed UnpackingUPS Clearance Anchor bolt tightening Anchor boltsOverview External Wiring DiagramPhase 3-wire Phase 4-wire Terminal Blocks and Power CablesRecommended Cable Size and Tightening Torque for 125kVA UPS Recommended Cable Size and Tightening Torque for 180kVA UPS Phase 3-wire Phase 4-wire Recommended Cable Size and Tightening Torque for 250kVA UPS Ilsco External Breaker Rating External Breakers100~225kVA 250/300kVA Grounding Wire10 External Connections Control WiresRecommended configuration with input neutral grounded Grounding configurationRecommended configuration with delta-input Grounding configuration without input neutral12 Grounding configuration with corner-grounded delta-input Grounding configuration with corner-grounded delta-input